How much do you know about the installation method of sliding aluminum art doors?

How much do you know about the installation method of sliding aluminum art gates

As people\’s living standards improve day by day, the needs of different customer groups are also constantly changing. Only by complying with the development of industry trends can we reverse the development of enterprises. Disadvantages, then one of the more common problems in the differentiated needs of customers is the installation of translationalaluminum art doors, which involves some professional skills For people who have not had installation experience, it is still a bit unfamiliar. So today, the editor of Fengshi Metal will focus on the Aluminum Art Gate Installation method and focus on some ideas and methods for the installation of translational aluminum art gates. For your reference, no matter how the sliding aluminum art doors change, some of them will not change at all. As long as we master the detailed changes, we can meet the needs of our customers.

How much do you know about the installation method of sliding aluminum art doors?

Classification and installation of sliding aluminum art doors

Sliding doorsGenerally It can be divided into two categories, namely single translation and double translation. Although the opening of these two types of doors is translation opening, the opening directions are different. Let’s talk about the double translation door first. First, we need to understand clearly. What is the width of the door leaf? What is the size of the gate opening, and then determine where to install the gate? Finally, we started to consider track burying. Track burying is the key point to consider. Whether the translation gate is installed smoothly has a lot to do with track burying. Now there are two kinds of gate tracks, one is \”V-shaped\” and \”U-shaped\”. ,

How much do you know about the installation method of sliding aluminum art doors?

There are two types of tracks shown. Now most of them are laid with V-shaped tracks. When laying tracks When we need to make a general calculation, generally speakingThe distance between the door leaf and the stone pillars must be calculated well, that is to say, the distance must be selected appropriately. Generally speaking, the calculation method is half the thickness of the door leaf plus the distance of the protruding position. On this basis, a gap of 2 cm can be added. For example, if the door is 6 centimeters thick and the upper slide is 5 centimeters, then when calculating, we should calculate it based on half the thickness of the door, 3 centimeters, and the upper slide 5 centimeters. After adding a 2 centimeter gap, we can get a distance of 10 centimeters. In fact, After installing it like this,

How much do you know about the installation method of sliding aluminum art doors?

There will be no such big gap between the door leaf and the stone. This can prevent some small animals from entering and exiting. When burying the track, we must follow what we just said Lay the track at a distance of about 10 cm from the center of the track to the wall. When laying, we also need to measure the level. The leveled track is generally flat, that is It means that the door will not swing back and forth on it. Once it is level, we can start to fix the fulcrum. We can add welding iron sheets on both sides of the track, then drill holes and fix it with expansion screws. After completion, we will start to measure the level and distance from the wall again. distance, after these adjustments, we can start to place the aluminum art gate on the track, and then start to specify the upper slide. The upper slide design can be divided into two types, namely the outside and the inside, with different characteristics. Differently, during this kind of installation outside, we We must consider the distance between the wall and the door, as well as the distance between the wall surface and the actual fixing. That is to say, some of the walls are made of dry-hanging stone with hollows in the middle, so we must consider this part when fixing to get the appropriate solution. After the size, start processing the upper slide fixings. If it is short, you need to pad it with something. If it is long, you need to cut it off. After the door is placed on it, you can move back and forth. Then start wiring and fixing the door opener and other equipment. Finally Start testing whether the door opens smoothly and make fine adjustments. At this point, the gate installation is basically completed, and the debris on the site has been cleaned up and delivered for use

This article is an original work, please indicate the source for reprinting [www.lvyizhipin.com]

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2024年12月23日
Next 2024年12月23日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信