If you want to decorate your new house quickly and well, in addition to the master\’s standard construction and skilled craftsmanship and fast progress, the arrangement of the decoration process is also very important. The correct decoration process can allow each decoration process to work closely together to avoid wasting time during gaps. Materials can also be brought in in an orderly manner to avoid piles of materials on the construction site, causing construction inconvenience and possibly damaging the completed area.
When many novices first start decorating, they may not know where to start and are confused. It just so happens that I have just finished renovating my house, and there are basically no problems. I would like to share with you the 21 steps of my home decoration process. Don’t do the opposite!
Mobile device and picture in man\’s hand
1. Smash the floor
Determine the decoration partner and decoration plan Finally, because our home needed floor heating and central air conditioning, the floor height in the house was not high enough, so the first thing we did when decorating our home was to smash the floor. This can also avoid affecting the closing and opening of the inward-opening anti-theft door.
For those who do not want to install floor heating, this step may be to demolish walls and build walls and remodel the house. Our apartment layout has not been changed, so we skip this step.
2. Central air conditioning
After determining the decoration plan, you can go to an air-conditioning store to select the brand and model you need. Dry floor treatmentAfter cleaning, the air-conditioning master can deliver it to your door and install the main unit and outdoor unit according to the designed location.
3. Water and electricity renovation
The plumber and electricity master will open a material list and order the materials. The plumber and electricity master will come to your home to carry out the water and electricity renovation. The probability of problems in this place is relatively high, mainly due to the number of sockets and the location of water and electricity. The solution is to fully consider in the early stage what electrical appliances are needed, where sockets are needed, etc. In addition, the cabinet designer can also come to your home for the first time to measure and help determine the water and electricity levels.
4. Floor heating
After the water and electricity renovation is completed, the masters from the floor heating merchants will come to install the floor heating.
5. Waterproofing
Waterproofing is the top priority in basic decoration projects. Make sure nothing goes wrong here. Waterproof materials must be chosen well, and it is best to make bathrooms, balconies, and kitchens waterproof.
At the same time, we strictly follow the standards of waterproof construction technology. The same is true for water closure and pressure tests. We cannot save trouble. Otherwise, there is no point in crying and returning for repairs if something goes wrong!
6. Backfilling
If there are no problems with the waterproofing acceptance, start backfilling the bathroom. Be careful not to use construction residues. There are special ceramic particles for backfilling. Rebar and frame construction technology.
7. Suspended ceiling
We made the woodworking suspended ceiling first because we needed to make some shapes. Carpenters and bricklayers come in alternately, usually laying bricks first, protecting the floor and then lifting the ceiling. There is a slight difference here.
8. Package pipeline
When the tiler comes in to lay the tiles, the exposed sewer pipes on the balcony and bathroom must be guaranteed. Here, I would like to remind everyone that when it comes to guaranteeing the sewer pipes in the bathroom, If possible, you can ask a carpenter to build a niche. It is more practical to store things.
9. Tile laying
In our home, we choose tiles for the living room, bathroom, kitchen and balcony. It’s the floor. Pay attention to the inspection when laying the tiles to avoid hollowing!
10. Kitchen and Bathroom Suspended Ceilings
We are making aluminum gusset ceilings. We start after laying the ceramic tiles. If we are making gypsum board suspended ceilings, it is the first stage of carpentry suspended ceilings. And completed
11. Painting
The wall is putty-powdered, sanded, and painted. At this stage, the decoration is basically half completed, and the appearance is basically finished. After painting, it will not be as ugly as a rough house. .
12. TV background wall
TV back design, some Nordic style decoration designs, geometric colored walls, or blackboard paint can be done at about this time p>
13. Since Leveling
For floor leveling, we insisted on using the self-leveling method. Although it costs a little more, the flooring master behind said that this is the real leveling method.
14. Bathroom
The smart bathroom toilet, showerhead, bathroom cabinet, mirror and online shopping rack can all be installed at this time. There is a detail issue that needs attention, which is the glass glue used when installing bathroom products. It is best to Buy quality ones yourself. The bathroom environment is relatively humid, and cheap glass glue can easily become moldy and turn black!
15. Wooden floors
It usually takes 2 days to install a wooden floor. After the floor is installed, pay attention to the protection of the finished product. Install cabinets and doors to avoid staining the floor. At the same time, pay attention to the closing dimensions of the floor and door pockets.
16. Wardrobe installation
Completed. The floor can be used to install the wardrobe, or some install the wardrobe first and then the floor.
17. Cabinet installation
When installing cabinets on the door, you need to pay attention to the protection of the finished products in the home. There is too much dust when cutting the countertops.
18. Door + door pocket + skirting installation
Many people install it first and then install the floor, but there is a problem of poor edge processing. The gap between the door frame and the floor is too large. We install it first. Installing doors on the floor will make it more beautiful. In fact, if you protect the floor well, it will have no impact.
Please clean it yourself. It’s too tiring to do this., the hard installation is finally over.
19. Bringing in furniture
It doesn’t matter the order in which the furniture comes in. At this time, the decoration is almost complete, and the rest is all kinds of shopping. . When purchasing furniture, pay attention to two points: environmental friendliness and size. Don\’t buy it and find that it blocks the socket or something. In addition, if you buy new furniture, you can buy some activated carbon and put it in the cabinet or on the furniture to absorb the smell.
#pgc-card .pgc-card-href { text-decoration: none; outline: none; display: block; width: 100%; height: 100%; } #pgc-card .pgc- card-href:hover { text-decoration: none; } /*pc style*/ .pgc-card { box-sizing: border-box; height: 164px; border: 1px solid #e8e8e8; position: relative; padding: 20px 94px 12px 180px; overflow: hidden; } .pgc-card::after { content: \” \”; display: block; border-left: 1px solid #e8e8e8 ; height: 120px; position: absolute; right: 76px; top: 20px; } .pgc-cover { position: absolute; width: 162px; height: 162px; top: 0; left: 0; background-size: cover; } .pgc-content { overflow: hidden; position: relative; top: 50%; -webkit-transform: translateY(-50%); transform: translateY(-50%); } .pgc-content-title { font-size: 18px; color: #222; line -height: 1; font-weight: bold; overflow: hidden; text-overflow: ellipsis; white-space: nowrap; } .pgc-content-desc { font-size: 14px; color: #444; overflow: hidden; text-overflow: ellipsis; padding-top: 9px; overflow: hidden; line-height: 1.2em; display: -webkit-inline-box; -webkit -line-clamp: 2; -webkit-box-orient: vertical; } .pgc-content-price { font-size: 22px; color: #f85959; padding-top: 18px; line-height: 1em; } .pgc-card-buy { width: 75px; position: absolute; right: 0; top: 50px; color: #406599; font-size: 14px; text-align: center; } .pgc-buy-text { padding-top: 10px; } .pgc-icon-buy { height: 23px; width: 20px; display: inline-block; background: url(https://lf6-cdn-tos.bytescm.com/obj/cdn-static-resource/pgc/v2/pgc_tpl/static /image/commodity_buy_f2b4d1a.png); } Pa\’s new upgraded version of formaldehyde-removing bamboo charcoal bag for new house decoration and household artifacts to remove odors in cars with activated carbon ¥158 Buy
20. Formaldehyde removal + cleaning
There is no need to rush to buy home appliances, the prices are getting cheaper anyway. The renovated house can be ventilated and deodorized, at least for half a year. Ventilation is the key. It is best to buy a sweeper and put it at home. It may automatically vacuum the bathroom at regular intervals, otherwise a lot of dust will accumulate.
#pgc-card .pgc-card-href { text-decoration: none; outline: none; display: block; width: 100%; height: 100%; } #pgc-card .pgc-card-href:hover { text-decoration: none; } /*pc style*/ . pgc-card { box-sizing: border-box; height: 164px; border: 1px solid #e8e8e8; position: relative; padding: 20px 94px 12px 180px; overflow: hidden; } .pgc-card::after { content: \” \”; display: block; border-left: 1px solid #e8e8e8; height: 120px; position: absolute; right: 76px; top: 20px; } .pgc-cover { position: absolute; width: 162px; height: 162px; top: 0; left: 0; background-size: cover; } .pgc-content { overflow: hidden; position: relative; top: 50%; -webkit-transform: translateY(-50%); transform : translateY(-50%); } .pgc-content-title { font-size: 18px; color: #222; line-height:1; font-weight: bold; overflow: hidden; text-overflow: ellipsis; white-space: nowrap; } .pgc-content-desc { font-size: 14px; color: #444; overflow: hidden; text-overflow : ellipsis; padding-top: 9px; overflow: hidden; line-height: 1.2em; display: -webkit-inline-box; -webkit-line-clamp: 2; -webkit-box-orient: vertical; } .pgc-content-price { font-size: 22px; color: #f85959; padding-top: 18px; line-height: 1em; } .pgc-card-buy { width: 75px; position: absolute; right: 0; top: 50px; color: #406599; font-size: 14px; text-align: center; } .pgc-buy-text { padding-top: 10px; } .pgc-icon-buy { height: 23px; width: 20px; display: inline-block ; background: url(https://lf6-cdn-tos.bytescm.com/obj/cdn-static-resource/pgc/v2/pgc_tpl/static/image/commodity_buy_f2b4d1a.png); } Xiaomi (MI) sweeping robot household ultra-thin silent wireless fully automatic vacuum cleaner Mijia intelligent planning cleaning cleaning robot sweeper remote APP control Xiaomi Mijia robot sweeper ¥1499 Buy
21. Check in
Choose one Good day, moving in. This is the end of the decoration. As for the soft furnishings, I think we can take our time and don’t rush.
In short, the arrangement of the decoration process is to control the rhythm of the decoration to achieve the goal of smooth completion. Finally, I hope everyone has a satisfactory home!