This is a set of \”general decoration process\” carefully organized by millions of owners. It is very useful for owners who need decoration and is basicallyDecoration Literacy\’s level.
1. Look at the furniture (purpose to determine style)
2. Discuss design (style, cost, color, materials, budget)
3. Determine the design plan
4. Customized cabinets
5. Look at the sanitary ware, order kitchen appliances, and order the overall cabinets. Check the kitchen plumbing diagram (see if there is a wall-mounted toilet, and see if there are wall-mounted bathroom cabinets). The bathroom cabinets should be ordered before plumbing, and consider the issue of drainage.
6. Decoration approval design drawings, reinforcement plans, property consultation
7. Select a decoration company (select a construction team)
8. Budget, review budget
9. Negotiate contracts, materials, and renovation progress
10. Construction approach (site setting out, communication)
11. Property procedures (knock on the wall to see if the water is blocked)
12. Kitchen measurement and air conditioning hole drilling
13. Purchase pre-embedded sanitary ware
14. Water and electricity construction, materials arriving (confirm budget) and application for gas connection.
15. Measuring tile usage
16. Buy ceramic tiles
17. Water and electricity acceptance
18. The masons enter the site, lay out the tiles and deliver them to your door, and provide guidance and communication
19. Buy sinks and water retaining strips
20. The mason is laying ceramic tiles and checking the cement label and yellow sand quality
21. Waterproof acceptance, kitchen tile acceptance
22. The carpenter enters the site and communicates (the carpenter issues a bill of materials and purchasesMaterials) Install the range hood, install the suspended ceiling, install the gas meter, and then call the cabinet master to adjust the dimensions.
23. Carpentry materials are brought into the site and carpentry is laid out
24. Designer on-site guidance
25. Masonry acceptance
26. Look at the finished door frames and doors
27. The owner chooses the door and lines, and looks at the sliding door
28. Look at the floor and measure the number of floors
29. Go to the industrial products market to look at hardware
30. Buy locks, door catches (hardware accessories)
31. Acceptance of suspended ceiling base (confirmation of sample)
32. Carpentry, laying panels and installing glass
33. Door line entry acceptance (purchase)
34. Carpentry ends
35. Carpentry acceptance
36. Paint enters the site, communicate and confirm color tone requirements
37. Painting materials are brought in and accepted
38. Order a shower room and buy sanitary ware, faucet and towel rack
39. Painters build walls, repairs, and subsidize owner inspections
40. Purchase flooring and make an appointment for installation
41. The painters polished the walls, installed cabinets, polished the walls and countertops, and they were all very dirty
42. Furniture paint is finished with latex paint
43. Carry out hygiene
44. Digging ridges
45. Choose curtains
46. Look at the lamps
47. The painting is basically completed and the sanitation and cleaning are accepted
48. The owner purchases lamps, switches, and electrical appliances
49. Wash cabinet, sanitary ware, door-to-door delivery
50. Electrician installation and inspection
51. Sanitary cleaning, floor delivery
52. Floor installation, sliding door installation
53. Baseboard installation
54. Latex paint finishing, air conditioning installation
55. Hygiene and cleaning
56. Decoration company (construction team, acceptance)
57. Check out and sign the warranty form
58. Send furniture and change door locks
59. Buying plants
60. On the premise of ensuring safety, keep the windows in the bathroom and kitchen open 24 hours a day to maintain ventilation.