For most people, a house is a lifelong matter. Only if it is decorated appropriately and comfortably can you live in peace of mind. However, many owners are usually busy, and some even work out of town. Can\’t keep an eye on it every day.

Although some owners know that they need to go to the construction site, they don’t know which link is most appropriate. When they go to the site, they don’t know what to pay attention to? This will create hidden dangers for decoration. So when do owners need to go to the site? Let’s take a look at the introduction below.

Clear disclosure at the start of construction

On the first day of construction, the owner, designer, project supervisor, and construction leader must participate. The designer will mainly explain the project drawings, budget, etc.

During this process, if you encounter any questions or do not understand something, you must communicate in time. On this day, you need to confirm with the construction party: the equipment needed on site; problems existing on site (such as bathroom blockage); confirmation of on-site production or special practices (such as the shape of woodworking products); written consensus reached on site, both parties need to abide by it after signing .

Material acceptance

Generally, decoration materials will be brought to the construction site before construction and compared with the materials on the budget sheet (usually water pipes, wires, cement, wooden boards, sand, Putty, etc.) Check whether the materials are consistent with those in the contract.

Mainly check carefully the brand, quality and quantity of materials. All these materials have been inspected in the early stage and the decoration owner has signed and confirmed them before construction begins.

Acceptance of water and electricity renovation

Water and electricity renovation is a more important link in hard decoration, because water pipes and wires are generally buried in the wall, and are directly related to the safety of electricity and water use. It is very convenient, but if there is a problem, it will be very difficult to repair and modify, and there will also be great safety risks. It is best to lay out water pipes and wires horizontally and vertically in strict accordance with construction requirements to avoid accidents.

Waterproof acceptance

If the waterproofing is not done well, water leakage and wall foaming will occur downstairs, threatening the safety of the residents. Therefore, sealing must be done before laying ceramic tiles. For the water test, the water at the highest point on the ground should not be less than 2 cm, and it must be stored for at least 24 hours. It will be considered qualified only if there is no leakage. If you are worried once, you can do a second water storage test and carefully observe whether there is water leakage.

Suspended ceiling acceptance

In addition to enriching the top surface shape, the suspended ceiling also has the functions of thermal insulation, heat insulation, sound insulation, and sound absorption. It is also used in electrical, ventilation, air conditioning, communications, fire protection, and alarm The hidden layer of pipeline equipment and other projects. Therefore, for the suspended ceiling, decoration owners must ensure that it is foolproof. When accepting the suspended ceiling, they must carefully check whether the keels, suspenders, and connectors are in the correct position, whether the materials are flat and straight, and whether the connections are firm and not loose.

It is considered qualified if there is no obvious misalignment on the surface, the width is even, the yin and yang angles are square, and the decorative line shoulder angle and cutting direction are correct. As for the metal gusset ceiling, it depends on whether the floor height is reasonable, whether the edges are neat, whether there are any leaks, etc.

Wall acceptance

The wall is also one of the important links in decoration. There are many forms of wall decoration, such as wallpaper decoration, latex paint decoration, and soft package decoration.

For walls decorated with wallpaper, it is necessary to check whether the wallpaper seams are accurate. Pay attention to the absence of bubbles, hollows, cracks, warping, wrinkles and stains. Glue marks should not be visible when squinting. .

For walls decorated with latex paint, it is necessary to check whether the surface of the latex paint on the wall is smooth and reflective, and whether there are hollows, bubbling, or cracking.

For walls decorated with soft packages, it depends on the keel and lining board of the soft package project. The frame should be firmly installed without warping, and the seams should be straight.

Ground acceptance

During decoration, the ground sometimes looks smooth, but if the ground height error is greater than 3mm, it will affect the laying of floors or ceramic tiles. For tile floors, it depends on whether the pattern and color of the floor are uniform and whether the width of the seams is reasonable.

Woodworking acceptance

Woodworking acceptance refers to the acceptance work after the carpentry work is completed, mainly checking whether there is damage and whether the cabinet door switch is qualified, etc. The key point during woodworking acceptance is to look at the workmanship. Details such as woodworking craftsmanship, edges, and surface treatment cannot be ignored.

Final acceptance

The final acceptance requires the participation of the owner, designer, project supervisor, and construction leader to conduct an overall acceptance of the project materials, design, and process quality, and pass the inspection Only then can you sign.

(Excerpted from \”Xinmin Evening News\”)

Source: Tonight\’s News

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2024年12月29日
Next 2024年12月29日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信