Analysis of common problems at fire acceptance site – fire door 2

Analysis of common problems at fire acceptance site - fire door 2

Acceptance items: Fire separation

Analysis of common problems at fire acceptance site - fire door 2

On-site problem description 4:

Steel fire door frame is not filled with cement mortar;

The steel fire-resistant window frames are not filled with cement mortar. In particular, you need to pay attention to whether the upper and lower frames of the fire-resistant doors and windows are filled in place.

Relevant specification requirements:

\”Code for Construction and Acceptance of Fireproof Roller Shutters, Fireproof Doors and Fireproof Windows\” GB50877—2014:

5.3.8 The door frame of steel fire doors should be filled with cement mortar. The door frame and the wall should be firmly connected with embedded steel parts or expansion bolts, and the distance between the fixed points should not be greater than 600mm.

5.4.2 The steel fireproof window frame should be filled with cement mortar. The window frame and the wall should be firmly connected with embedded steel parts or expansion bolts, and the distance between the fixed points should not be greater than 600mm.

Analysis of common problems at fire acceptance site - fire door 2

On-site problem description 5: The fire door does not have a permanent sign in an obvious location, or the sign is not comprehensive.

Relevant specification requirements:

\”Code for Construction and Acceptance of Fireproof Roller Shutters, Fireproof Doors and Fireproof Windows\” GB50877—2014:

4.3.2 Each orange fire door shall be equipped with a permanent sign on its visible part, and shall indicate the product name, model, specification, fire resistance and trademark, name and address of the production unit (manufacturer), and date of manufacture. And product production batch number, implementation standards, etc.

Analysis of common problems at fire acceptance site - fire door 2

On-site problem description 6:

The inclination angle of the outdoor evacuation stairs is greater than 45°, the evacuation door is facing the stairs;

Open doors, windows, and openings on the wall within 2m around the outdoor evacuation stairs.

Relevant specification requirements:

\”General Code for Building Fire Protection\” GB55037-2022:

7.1.11 Outdoor evacuation stairs shall comply with the following requirements:

1. The height of the handrails of outdoor evacuation stairs should not be less than 1.1m, and the inclination angle should not be greater than 45°;

2. Except for the outdoor evacuation stairs of buildings with 3 floors and below, which can be made of flame-retardant materials or wooden structures, the steps and platforms of the outdoor evacuation stairs are Non-combustible materials should be used;

3. Except for evacuation doors, there should be no other openings on the wall within 2 meters around the stairs, and the evacuation doors should not face the stairs.

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

6.4.5 Outdoor evacuation stairs should comply with the following regulations:

3 , stairs and platforms should be made of non-combustible materials. The fire resistance limit of the platform should not be less than 1.00h, and the fire resistance limit of the stairs should not be less than 0.25h.

4. The door leading to the outdoor stairs should Use Class B fire doors and open outwards.

5. Except for evacuation doors, 2m around the stairs There should be no doors, windows or openings on the interior walls. Evacuation doors should not face stairs.

Analysis of common problems at fire acceptance site - fire door 2

On-site problem description 7:

Indoor rooms of residential buildings larger than 54m that are set up against exterior walls are not equipped with Class B fire doors as required by the design.

Related specification requirements: span>

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

5.5.32 For residential buildings with a building height greater than 54m, each household should have one room that meets the following requirements:

1. It should be set up against the exterior wall, and the exterior window should be openable;

2. The fire resistance limit of the internal and external walls should not be less than 1.00h. The door of the room should be a Class B fire door. The fire resistance integrity of the exterior windows should not be less than 1.00h. .

Analysis of common problems at fire acceptance site - fire door 2

The pictures are from the Internet. If there is any infringement, please contact us to delete them.

Message at the end of the article:

Good-looking skins are all the same, but interesting souls are unique.

@bin马AYedu (firefighting) is walking with you, let’s be interesting together!

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年1月1日
Next 2025年1月1日

相关推荐

  • 江蘇宿遷,娃雙手卡防火門哭著說再也不放瞭

    視頻加載中… 近日,江蘇宿遷,一小男孩貪玩不慎將雙手卡進防火門,傢長施救無果報警求助。宿遷消防趕赴,現場男孩疼得哭聲停不下來,消防員邊擴大門縫隙邊暖心安撫,傢長在一旁倒油潤滑下,成功將娃救出。消防員雖心疼但還是嚴肅勸誡道,娃這回是真老實瞭,哭著說不會再放瞭。 來源:中國消防

    防火门 2024年12月6日
    20
  • 防火门,一扇重要的生命安全门

    在我们生活的每一个角落,都有着无声的守护者,那就是防火门。它可能并不起眼,但却是我们生命安全的最后一道防线。今天,让我们一起来探索防火门的重要性,以及它在我们生活中扮演的关键角色。 首先,让我们来看看防火门的历史。防火门的出现可以追溯到很久以前,早在古代,人们就开始意识到火灾对生命和财产的威胁。于是,他们开始研究各种防火措施,其中就包括防火门。随着技术的进步…

    防火门 2024年3月15日
    20
  • 防火門能否防火?長島消防專項整治

    來源:【煙臺日報-大小新聞】 大小新聞客戶端11月21日訊(通訊員 冷丹丹)為規范使用領域防火門市場秩序,杜絕企業無證生產、借資質生產和不按產品標準進行生產等違法行為,提升使用領域防火門產品質量,連日來,煙臺長島消防救援大隊開展驗收(備案)合格的建設工程安裝使用防火門專項整治行動。 檢查開始前,檢查人員對轄區驗收(備案)合格的建設工程安裝使用防火門進行登記造…

    防火门 2024年9月1日
    370

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信