From buying a house to moving in, there is a way to decorate it~ However, for many people, decoration is a strange thing. The house can be renovated in three months, but it has been delayed for a year or two! \”Hey, I don\’t know why the process is delayed…\”
△ Someone else’s wedding room was installed in 45 days
Indeed, knowing the decoration process can make the decoration proceed in an orderly manner, greatly shorten the decoration period, and help you move into your new home as soon as possible! ! ! Today we will talk about the specific process sequence of decoration:
1. Preparation
The first thing you should do when you get your new house and prepare it for decoration : Determine the budget, decoration style and decoration method!
1. Determine the budget
Chacha Kari The remaining balance, how much money to prepare for decoration, and a detailed decoration budget.
Assume that 30W is prepared for decoration, and 20% (i.e. 6W) is reserved as backup gold (to cope with the excessive decoration desire), and the remaining 24W is the real decoration cost:
- Hard decoration About 30% (i.e. 7.2W);
- The main material is about 30% (ie 7.2W);
- Furniture + electrical appliances are about 30% (i.e. 7.2W);
- Soft decoration is about 10% (i.e. 2.4W) .
2. Select style
What style of home do you want, you must be clear in the early stage, otherwise you will pretend to be completely different…
◆If you want your home to be more fashionable and trendy, you can choose modern Wind or simple style:
△Modern casual style
△Modern minimalist style p>
◆If you want your home to be more elegant and refined, you can choose French, light luxury and other styles:
△ Light luxury French style
◆If you want your home to be extremely simple and elegant, you can choose the minimalist style:
△Minimalist
◆If you have a small budget, you can consider choosing Nordic and Japanese styles that are relatively cost-effective:
△Japanese + Nordic mix
Of course, if you want to make your home visually more advanced and more comfortable to live in, no matter which style you choose, it will not save money. Everyone needs to be clear about this~
3. Choose the decoration method
There are three decoration methods, clear package, half package, and full package:
For the majority of office workers, half-package is relatively more worry-free and labor-saving; of course, if you just want to be a hands-off shopkeeper and move in, you can choose full-package; if you want to experience the decoration by yourself \”Bitterness and joy\”, just choose and clear the package. Find a good day to start the work!
2. Demolition, modification and new construction
First, follow the Designed for partial demolition and new construction:
△【Blue City Regency Bay】Project Plan
If the old house is renovated, the original decoration needs to be removed first, and then rebuilt according to the design drawings. Note: load-bearing walls, counterweight walls, load-bearing columns, The beam cannot be moved!
3. Door and window replacement
If you need to seal the balcony or replace the windows, then It will be done after disassembly and modification.
ps: If the entrance door also needs to be replaced, it must be installed at the latest before the masons come in; if your home is on the first floor, it is recommended to install the doors and windows before proceeding to the next step to avoid building materials tools Lost.
4. Water and electricity renovation
If you need to install central air conditioning, fresh air system, and floor heating, you need to arrange for three parties to come to the site to measure and negotiate the wiring construction before the formal water and electricity transformation. After the completion, you need to make an explanation with the water and electricity master.
△【Weixing Guobin Station】Water and electricity renovation
Be sure to plan all large-scale projects before renovation The location of electrical appliances, such as refrigerators, dishwashers, range hoods, water heaters, washing machines, etc., and reserve more sockets! ! Especially in the kitchen▽
5. Mud and Tile Construction
Mud and tile projects mainly include: pipeline construction → wall base treatment → wall waterproofing → laying wall tiles → painting the ground waterproofing → closed water test → laying floor tiles → cleaning and protection → Mark the △ package pipe
ps: If a niche is needed, leave space for the niche when wrapping the pipe.
△Floor tiles
Note that for some special-shaped bricks such as hexagonal bricks and feather bricks, pre-layout is required before paving to avoid paving errors
In addition, after finishing the wall tiles, don’t forget to mark them. Clearly mark the location and direction of water pipes and wires hidden inside the wall and under the wall tiles to facilitate the later installation of cabinets, cabinets, lamps, etc.:
After laying the wall tiles and floor tiles, protective measures must be taken to avoid bumps in the future. Now comes the carpentry construction stage:
6. Carpentry Construction
Carpentry construction mainly includes: gypsum board ceiling, curtain boxes, whole house cabinets, floors, doors and door covers, wall parapets, island tables, etc. All carpentry construction is required. Follow the design drawings:
△suspended ceiling
△Parenting Wall
△Floor
In order to control the renovation period, if you choose to customize the cabinets for the whole house, the final size retest will usually be carried out after the brickwork is completed, and it can be installed in time after the overall construction is completed.
7. Paint construction
After the carpentry is completed, it is the painting construction, that is, the latex paint and wood paint construction on the walls, ceilings, and on-site wooden surfaces. If there is no on-site wood production, there will only be walls and latex paint application on top.
Among them, the construction process of latex paint on the wall is as follows: wall inspection → painting Interface agent → base leveling → hanging mesh cloth → scraping putty → polishing → applying primer → applying topcoat
△Wall polishing
△Detail processing
Attention should be paid to the construction of latex paint:
① The paint construction on the wall requires one coat of primer and two coats of topcoat.
② Avoid painting construction in rainy weather. The air humidity is high and the paint will dry slowly, which will affect the effect.
③ The application methods of topcoat include roller coating and spraying, and the texture of roller coating is Good, easy to repair, but there will be flower marks; spraying is more efficient, smoother, easier to apply, but requires a lot of paint.
In addition, due to differences in space size and lighting conditions, the color of latex paint needs to be adjusted according to the actual situation. Therefore, in order to achieve better spatial effects, latex paintIt requires on-site manual color adjustment and color testing before large-scale construction:
△The paint master of Feimo Family mixes and tests colors on site under the guidance of the designer
The completed painting project site is shown in the picture▽
The painting construction is over, and the hard decoration has come to an end, followed by variousInstallation projects are coming on site one after another:
8. Installation projects
Requires installation:
◆ Floor: Floor
◆ Wall: wallpaper/wall covering, wainscoting, baseboards, switches and sockets, wall lamps, radiators, interior doors/door frames
◆ Ceiling: lighting, central air conditioning/fresh air vents
◆ Whole house: customized cabinets, integrated ceilings, kitchen and bathroom ware and various Large and small household appliances
△Feimojia’s own factory-customized cabinet installation
9. Soft decoration enters the scene
Soon after, soft furnishings such as curtains, sofas, beds, tables, chairs, and benches can all be introduced:
△[Jianfa Yonglong Mansion] soft decoration is on the scene, and the real-life blockbuster is about to It’s online~
At this point, the decoration process is completed and the new home is officially completed! However, it is best not to move in immediately. Considering the formaldehyde residue during decoration, it is recommended to ventilate it for 3-5 months before moving in! There are countless projects and processes, but they can be summarized into the above 9 categories, so…are you clear? Read it again!