Summer is here, the weather is sunny, and it is a good season for decoration! Recently, many owners have sent private messages to Feimojun, asking about many things about decoration. Without further ado, here is the whole house decoration process, take it away without any thanks!
Preparation before decoration
Does decoration start with construction? No! Preparation in the early stage of decoration is also a very important part of decoration.
01 Confirm decoration needs
The first step in decoration is to confirm your decoration needs!
Confirm the decoration needs include: How many people live there permanently? How many bedrooms are left? How many bathrooms are left? Whether there is any renovationRequire? Is there any space you wish to add through design? What style of decoration do you like? Ask yourself these questions first, list the results, and clarify your needs, so that you will not be confused about decoration!
02 Choose decoration method
After confirming your decoration needs, you need to choose the decoration method that suits you! There are three decoration methods: full package, clear package, and half package.
Full package: from design to construction to purchasing materials, the decoration company takes care of everything. The owner is responsible for paying and moving in; this is the most worry-free, but the owner will have less initiative in decoration. Suitable for owners who are completely time-poor.
Clear package: Completely opposite to full package, from design to construction to purchasing materials, everything is managed by the owner himself; time-consuming and labor-intensive, And the requirements for the owner’s own decoration experience are high.
Half package: between the first two, the decoration company is responsible for design + construction + auxiliary materials; the owner is responsible for purchasing the main materials Furniture and appliances; owners have the initiative to decorate, but they don’t have to worry too much, and they buy the main furniture and appliances themselves, so they don’t have to worry about the decoration company shoddy.
In general:
● Full package is suitable for owners who have no time to decorate;
● Clear package is suitable for owners who have time and decorateOwners with rich repair experience;
● Half package is suitable for most office workers who want to participate in decoration but don’t want to spend too much energy.
03 Find a decoration company
Decoration company: an ordinary decoration company, popular decoration, quite satisfactory, and the cost is in the middle.
Design company: Customized design, the effect is more beautiful and practical, and will design and plan according to the needs of the owner; however, the design fee will cost more than Ordinary decoration companies are a bit higher.
Construction team: only responsible for construction, not design.
Road decoration team: only responsible for the construction of a certain type of work, without after-sales guarantee.
Not many suggestions, just choose according to your needs! In addition, you also need to make your own budget!
Hard decoration under construction
When everything is ready, we will enter the hard decoration construction stage!
01Demolition and reconstruction
● Construction content: demolition of walls and new construction; demolition of original finely decorated second-hand houses decorate.
● Estimated construction period: 2-3 days for new rough houses, and about one week for second-hand houses/old houses/furnished houses.
● Construction precautions: All load-bearing walls, beams, public facilities, etc. cannot be demolished.
02 Water and electricity construction
● Preparation before decoration: need to confirm the location and size of all electrical appliances; confirm all switches The number of socket locations; central air conditioning and floor heating must be installed before water and electricity are started.
● Estimated construction period: 2-3 weeks. The larger the area, the longer it will take.
Designers will design the switches and sockets, so you basically don’t have to worry about them yourself; central air conditioners, etc. are also installed by merchants.
The most important thing we need to pay attention to is to confirm the size and position of all electrical appliances, because different products will definitely have different sizes. ; It is not necessary to buy it, but the most basic style must be confirmed.
Formal construction process: water and electricity disclosure → water and electricity estimate → material arrival → release Wire grooving→Strong and weak electric pipes→Water supply and drainage pipes→Strong electric box sorting→On-site cleaning→Project inspection→Acceptance
03 Bricklaying Construction
● Preparation before construction: all wall tiles, floor tiles, doors and windows must be purchased .
● Estimated construction period: around 3 weeks
● Construction process: including pipeline construction → Wall base treatment → Paint the wall waterproof → Lay wall tiles → Paint the floor waterproof → Closed water test → Lay floor tiles → Clean and protect
04 Carpentry construction
Preparation before construction: protect the bricks that have been laid;
Construction content: ceiling construction, wall wood base, on-site cabinet production, door panel wiring production.
Estimated construction period: about 2 weeks if there is no on-site carpentry work (such as making cabinets), more than 3 weeks if there is any, depending on the project volume
Overall construction process: laying out positioning → installation of light steel keel frame → gypsum board facing → cabinet production → wiring and door panel production → wooden base production → door panel installation and debugging → cleaning and protection
Suspended ceiling process: laying out wires → drilling → installing booms → installing keels → making curtain boxes → making air vents → concealed acceptance of keels → installing gypsum boards p>
Wall wood base: lay out and drill holes → install base keels → make base frame and adjust the level → install decorative panels.
Door panel process: Preparing materials and cutting panels → Selecting decorative panels → Pressing → Edge collection → Edge sealing → Clean edges → Door installation → Installation and debugging
The more carpentry construction projects there are, the longer it will take. If you don’t suspend ceilings or do woodwork, it will be very short;
PS: The wooden floor is not a carpentry construction project, the wooden floor is installed by the merchant.
05 Paint Construction
Preparation before construction: Ordinary latex paint is generally provided by decoration companies, but If you want to change products, such as art paint, microcement, etc., you must purchase them in advance.
Estimated construction period: about one month; it should be noted that the paint is greatly affected by the weather. If it encounters continuous rain, The weather prevents construction, so the time will be changedA little longer.
Construction process: wall inspection → brush interface agent → base leveling → hang mesh cloth → scrape putty → polish → apply Apply primer → apply topcoat
Of course, the estimated construction period is calculated based on working days, because the community does not allow construction on rest days; and the larger the amount of the project, the longer the decoration time will definitely be.
The paint is done and the hard decoration is in the final stage!
Hard decoration ends, soft decoration enters the scene
Mainly required: installation of various finished products and entry of furniture.
Installation projects: ceramic tile seams, wooden floors, various home appliances, customized furniture, etc.
Estimated period: 1-3 weeks, control it yourself.
Ventilation to remove formaldehyde
Can I move in once all the soft furnishings are in? No, ventilation must be used to remove formaldehyde, and the room can only be moved in after the formaldehyde content reaches the standard.
Formaldehyde qualification standard: the maximum allowable concentration of formaldehyde in the room air is 0.08 mg/cubic meter.
The most effective method is: opening windows for ventilation
Auxiliary tools: fresh air system
Ventilation tips:
①The time can be selected from 10:00 am to 4:00 pm. Windows will not be opened in rainy weather.
②When ventilating, all cabinet doors and drawers should be opened
③You can use screws. Wipe the surface of the cabinet with a dry wet towel to improve ventilation.
④ You can choose a fan to increase air convection.
⑤In low-temperature weather, you can use heating equipment to increase the indoor temperature and then ventilate it, the effect will be better.
It is inevitable that there will be a lot of things that you don’t understand when decorating for the first time, but as long as you find a decoration method that suits you, clarify the decoration process, and don’t “hands off the shopkeeper”, we will definitely be able to decorate a beautiful home. Home~ I wish you all to live in your new home soon