Panel installation video.
·After receiving the new panel, remove the old panel. Because there is no glue on the two sides, the panel cannot be fixed, so there are reserved upper and lower edges at the factory. Glue on both sides.
·Tear off this bit of glue, tear it diagonally, just tear it in half. You don’t need to tear too much, leave half in case you need to tear it in half next time.
·Then cover the newly brought panel, flatten it, and cover it well.
·Then press the place where the tape was just torn off with your hands to fully stick it. Stop for a while and it won\’t fall off. The back is stuck.
·Then put the two top buttons on the left and right sides of water, and tighten these screws. Here are the Install one-third of the knob. When installing this knob, pay attention to it. This knob has left and right. If it is turned off, it will be installed back to back, so if it is installed like this, change it left and right.
·Then fasten the stove frame and the installation is completed.
本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834