Bathroom aluminum alloy door (double package)

Bathroom aluminum alloy door (double package)

Bathroom aluminum alloy door (double package)

HJSJ-2024

Use of bathroom aluminum alloy doorNo package, single package, double packageThe construction sequence is different, and sufficient size needs to be reserved in advance for the size of the door opening, because the door cover will cause the door opening to narrow after being wrapped.

When designing, the designer should ask the owner in advance which hemming method to use? The price of a double pack is more expensive than a single pack, and the main materials used also increase accordingly.

The non-package and single-package require the door manufacturer to install the aluminum alloy door cover in advance, and then the bricklayer will collide and close the door leaf before installing the door leaf.

Double-package construction does not require the installation of door covers in advance. After the bricklayers have laid the ceramic tiles and cleaned them, the door manufacturers will then come to install the aluminum alloy doors.

Bathroom aluminum alloy door (double package)

△Door cover

Bathroom aluminum alloy door (double package)

△The difference between single-sided door covers and double-sided door covers

The following is provided by Huajian Craftsmanship Society and Huajian Environmental Design Institute to popularize bathroom aluminum alloy door installation matters for designers. Follow Huajian School to design.

Aluminum alloy door installation procedures and processes

1 Aluminum alloy door covers not included:

Installation process and technology:

Measure the size of the door opening – customize the aluminum alloy door according to the measured size – install the door frame on site – fix the door frame on both sides to be covered with cement mortar – tile the interior wall of the bathroom to cover the door frame – plaster the cement mortar on the exterior wall of the bathroom Ash covers the door frame – the door frame is installed, the internal and external joints are glued and the door leaf is installed.

Bathroom aluminum alloy door (double package)

△Construction drawing without aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Aluminum alloy door cover not included

Bathroom aluminum alloy door (double package)

△Aluminum alloy door cover not included

2 Single package aluminum alloy door cover:

Installation process and technology:

Measure the size of the door opening – customize the aluminum alloy door according to the measured size – install the door cover on site – fix the door cover with cement mortar on both sides – tile the inner wall of the bathroom to wrap the door cover – the door cover connects the inside and outside Apply glue to close the opening – install the door leaf.

Bathroom aluminum alloy door (double package)

△Single-pack aluminum alloy door cover construction drawing

Bathroom aluminum alloy door (double package)

△Single package aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Door cover single package

Bathroom aluminum alloy door (double package)

△Single package aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Single package aluminum alloy door cover

3 Double-wrapped aluminum alloy door cover:

Installation process and technology:

Measure the size of the door opening – customize the aluminum alloy door according to the measured size – complete the tiling of the interior of the bathroom – complete the plastering and scraping of the exterior of the bathroom with latex paint – install the door cover and door leaf simultaneously – the internal and external links of the bathroom aluminum alloy door Apply glue to close the mouth.

Bathroom aluminum alloy door (double package)

△Double-clad aluminum alloy door cover construction drawing

Bathroom aluminum alloy door (double package)

△Double-wrapped aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Double-wrapped aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Double-packed aluminum alloy door cover

Bathroom aluminum alloy door (double package)

△Double-pack aluminum alloy door cover

Note:

The installation of the bathroom aluminum alloy door does not include any package, and the construction process, construction sequence, amount of materials used and cost will be different between single package and double package. Therefore, the plan must be confirmed in advance and technical explanations should be made to each team.


For more construction techniques, please follow us↓↓↓↓↓↓

The content of the construction drawings comes from the \”Official Website of Huajian Craftsmanship Society\”

More general construction drawings

Can be downloaded from Huajian Crafts Society

Bathroom aluminum alloy door (double package)

This article was written

Huajian Environmental Design Institute

ed.Editor: Liang Wei, Liao Chiwei

Picture: Su Yuntao

Reviewer :

Huang Zhiqin (registered first-class construction engineer)

Chen Tao (registered first-class construction engineer)

Published in October 2024

Bathroom aluminum alloy door (double package)

HJSJ-2024

The copy is published by the team of Huajian Crafts Society

Mainly for students

Due to the teaching characteristics of copywriting

its content May be freely copied, printed and distributed

Commercial use prohibited

More design highlights→Click to follow Huajian Environmental Design Institute

Bathroom aluminum alloy door (double package)

▼ Click to read the original text and get this set of information immediately

Bathroom aluminum alloy door (double package)-111 Huajian Crafts Society.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年1月12日
Next 2025年1月12日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信