According to news from the financial industry on January 15, 2025, information from the State Intellectual Property Office shows that the Wanmipo Hydropower Plant of Wuling Electric Power Co., Ltd. applied for a project called \”a flood control system based on segmented regulation\”. The patent \”Arc Door Synchronous Automatic Operation Method and System\”, publication number CN 119292108 A, application date is September 2024.
The patent abstract shows that the present invention discloses a method and system for synchronous automatic operation of a spill arc door based on segmental adjustment. The method of the present invention includes dividing the full opening range of the spill arc door into N openings. Degree segments L1~LN, determine the opening segment L for each opening segment Li respectively The shutdown protection parameter Pi of i; during the pre-flood flood arc gate debugging and opening and closing operations, the current fault shutdown point opening segment Lj of the spill arc gate is determined based on the operating opening of the spill arc gate, and based on the current The shutdown protection parameter Pj of the fault shutdown point opening segment Lj controls whether the overflow arc door activates shutdown protection. The invention aims to reduce the number of unnecessary shutdowns of the overflow arc door caused by excessive instantaneous opening and oil pressure deviations during automatic operation of the system due to structural deformation of the overflow arc door steel, and increase the number of unnecessary shutdowns of the overflow arc door. The fault tolerance of the spill arc gate ensures the reliability of the synchronous and automatic operation of the spill arc gate.
Tianyancha data shows that Wuling Electric Power Co., Ltd. Wanmipo Hydropower Plant was established in 2004 and is located in Xiangxi Tujia and Miao Autonomous Prefecture. It is a company mainly engaged in the production and supply of electricity and heat. of enterprises. The registered capital of the enterprise is None. Through Tianyancha big data analysis, Wuling Electric Power Co., Ltd. Wanmipo Hydropower Plant has participated in 37 bidding projects and has 11 patent information. In addition, the company also has 9 administrative licenses.
This article comes from the financial world
本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834