The door is the first line of sight at home, related to the safety of the home and the aesthetics of the owner. At present, aluminum-wood doors are favored by modern young people, but installing aluminum-wood doors is a problem for stores. Correct installation can extend the service life of aluminum wooden doors, so what issues should be paid attention to when installing aluminum wooden doors?
Today Xiaodi will show you the correct installation sequence of aluminum wooden doors and some precautions. If you clarify the relevant aspects in advance, you can easily handle it during installation.
Set door installation tutorial
Tool display: impact drill, T-shaped hex wrench, hammer, electric drill, foam glue, level measuring instrument, utility knife, screwdriver, tape measure, screws Several, pencils and other tools.
Installation of the main door cover
- Put the main door cover into the door opening, open the door leaf, and connect it with the wall Body at 90 degree angle
- Fix 2 screws on the left and right borders of the main cover to fix the main cover in the door opening
- Open and close the door leaf several times to confirm that the door gap is between 3-4mm and the four corners of the door are flat. If it is not flat, you can use wooden blocks between the main cover and the door opening. Screw fixation
- Add 3 screws to the left and right borders of the main cover to fix the main cover in the door opening
- Use a level to measure the frame of the main set to ensure that the main set is installed vertically
- If the door gap is uneven, you can adjust the hinges on the door leaf to make the gap larger when tightening and smaller when loosening
Installation of sub-covers
- Clearly distinguish the matching sub-covers, unpack them and lay them flat Put it away
- Reinforce the left and right corners with flat corner codes and quick-installation corner codes, and tighten the screws
- Adjust the screws on the flat corner code Make the surface of the secondary sleeve flat and smooth
- Put the secondary sleeve flat on the ground and put the connecting plate into the card slot
- Use screws to fix the connecting plate and sub-sleeve
- Use screws to fix the two connecting plates horizontally and vertically
- Inject the foam glue evenly into the gaps around the door hole and the main cover
- Place moisture-proof strips
- Put the vice set indoor opening, make sure the connecting plate is inserted into the card slot of the main sleeve, and both ends of the moisture-proof strip are well connected with the main sleeve
- Put an appropriate amount of foam glue between the secondary cover and the door opening
- Use screws to fix the main sleeve and connecting plate
- Install the adhesive strip into the main cover and cover the screws
- Open and close several times to confirm there are no other problems
Inspection method for qualified door installation
1. Check whether it is in accordance with the drawings And processing technology production, real materials
2. Check the surface of the door to see if there are scratches, bumps and other trauma
3. Check whether there are no obvious processing marks and no coloring defects on the surface of the aluminum material
4. Check whether the hinges, door locks, handles, and door suckers are of the predetermined brand and model
5. Check the size and opening of the entire door The dimensions are consistent
6. Check the sealing strip to ensure that it is fully inserted into the groove, smooth and without distortion, seamlessly connected, and reaches the ground
7. Check that the door lining should be installed horizontally and vertically; the side of the door casing and the large surface of the door leaf should be perpendicular to the ground; the side should be parallel to the large surface of the door leaf
8. Check whether the aluminum wooden door is flat and square, cannot be warped and deformed, and must meet the tolerance requirements (national standards)
9. Package door installation products Ties between partsThe joint should be tight, firm, seamless, and free of movement. After the door leaf is closed tightly, it is tightly integrated with the sealing strip and does not swing
10. The hinge installation is not skewed, holes are drilled according to the mold, and the keyhole position is accurate
11. The door leaf and door lock can be opened flexibly and without any abnormal noise. But it cannot be installed as a \”self-closing door\”
12. The gaps between the door panels of the set door are even and meet the requirements, and the door cover is installed squarely and not skewed
13. The line shape is uniform; the depth of the notch is consistent and there is no wave
14. Use fixing screws between the door frame and the wall, no less than 3 per meter
15. The cable sleeve interface must be flat, and the allowable tolerance for the cable sleeve curvature is 1 mm
本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834