Renovation is a complex and systematic project. The following is my renovation process: from July 29, 2024 to handover-2024 Entering the fire on December 18th!
1. Preparation
1. Determine the style
Before decorating, you must first Determine the overall decoration style. This can be decided based on the preferences of your family members, the structural and functional needs of your home. I pursue saving money, so I chose minimalist decoration with a simple style.
2. Plan your budget
It is crucial to develop a detailed budget plan. The budget should include basic decoration costs, mainly including: water and electricity renovation, wall and floor treatment, such as ceramic tiles, floors, doors and windows, etc.
Generally speaking, basic decoration costs account for about 30% – 40% of the total budget, main material costs account for 40% – 50%, and furniture, electrical appliances and soft furnishings account for the rest. But this is only a rough ratio, and the specifics will vary depending on the decoration style and material selection.
3. Choose a decoration company or construction team or self-installation
If you choose a decoration company, you should examine its qualifications, reputation, past decoration cases and reputation . You can ask friends and family for recommendations, or you can check reviews of decoration companies online.
If you choose a construction team, make sure the workers have rich experience and good workmanship. At the same time, both the decoration company and the construction team must sign a detailed contract to clarify the rights and obligations of both parties, including the content, construction period, quality standards, payment methods, etc. of the decoration project.
Of course, self-assembly is more troublesome. You need to select materials and conduct on-site inspections every day.
4. Obtaining documents
For residential decoration, you need to apply for a decoration license and other related documents from the property management company. Provide relevant information according to the requirements of the property, such as house plans, decoration plans, etc.And pay a certain renovation deposit, construction waste removal freight, etc.
My renovation deposit is 1,000 yuan.
2. Main body dismantling and modification
According to the decoration drawing design plan provided by the property management company, if the structure of the house needs to be adjusted, such as removing non-load-bearing walls, building new partitions, etc., this stage must be carried out. However, when carrying out main demolition and renovation, we must pay attention to the structural safety of the house and avoid dangerous behaviors such as demolishing load-bearing walls.
3. Hydropower Engineering
1. Planning
Plumbers will work according to the design plan According to the owner’s living habits, determine the direction and location of water and electricity lines. The locations of sockets and switches that you need to install must be convenient for use, and the locations of faucets and showerheads must be ergonomic.
2. Installation
Carry out the laying of water pipes and electrical conduits. Try to use PP-R pipes for water pipes and PVC pipes for electrical wire pipes. After the water pipe is installed, a pressure test must be performed to ensure that there is no leakage in the water pipe; the wires in the electrical conduit must be color-coded to facilitate the differentiation of live wires, neutral wires, and ground wires. At the same time, strong and weakElectricity should be laid separately to avoid signal interference.
4. Waterproofing Project
Waterproofing should be done in areas where water is prone to accumulate, such as bathrooms, kitchens, and balconies. First carry out base treatment on the floor and walls, and then apply waterproof coating, at least 2-3 times.
After the waterproofing project is completed, a closed water test must be conducted for no less than 24 hours. Observe whether there is leakage at the corresponding location downstairs. If leakage is found , timely rework processing.
5. Mud and Tile Engineering
1. Building Walls
If there is a need for a new wall, this Proceed in stages. When building a wall, ensure the verticality and flatness of the wall, and the brick joints must be uniform.
2. Tiling
Including the laying of wall tiles and floor tiles. When laying floor tiles, pay attention to the drainage slope to avoid water accumulation; the wall tiles must be firmly adhered and the brick surface is flat. The yin and yang corners must be spliced with 45-degree chamfers or treated with yin and yang corner tiles.
6. Door and window installation
The installation of doors and windows can be carried out after the masonry project is completed. When selecting doors and windows, pay attention to quality and sealing. When installing, ensure that the gaps between doors, windows and walls are well sealed to prevent air and water leakage.
7. Painting project
1. Base treatment
For walls, After the top surface has been treated with the base layer, at least 2 and 1 bottom surface must be scraped with putty. Each pass must be done after the previous pass is completely dry.
After scraping for 3 seconds, use sandpaper to polish the top surface of the wall to make the surface smooth and even. Pay attention when sanding to avoid sanding marks.
2. Latex paint
Choose your favorite latex paint, which is usually contracted. You also need to apply 2 base coats and 1 top coat. Pay attention to whether the color is uniform and consistent.
The video is loading…
8. Installation Project
1. Install lamps
According to the design plan, install various lamps at appropriate locations. Chandeliers, ceiling lights, downlights, etc. During the installation process, pay attention to the fixtures being firmly fixed and the wiring connections being correct. If you know how to install it, just install it yourself. If you don’t know how, you can just hire someone to do it for a few hundred yuan.
2. Install switch socket
Install switch sockets according to the points determined by the water and electricity project, ensure that the switch control is normal, the neutral line, live wire and ground wire should not be connected incorrectly and reversely, and the sockets are well energized.
3. Install the kitchen. Bathroom appliances
Install kitchen stoves, range hoods, disinfection cabinets and other electrical appliances, as well as bathroom water heaters, bathroom heaters and other electrical appliances. During installation, follow the product instructions to ensure safe use.
9. Furniture, home appliances and software. Installation entry
1. Furniture installation
p>
Including the installation of sofas, beds, wardrobes, dining tables and other furniture. Where do you usually buy it, it comes with installation included? I bought mine from JD.com, and it also comes with door-to-door installation.
2. Place home appliances
Place TVs, refrigerators, washing machines and other household appliances in appropriate locations, and connect power supplies and related circuits.
3. Soft furnishings
Finally, the soft furnishings are arranged, hanging curtains, placing decorations, and laying carpets to create a warm and comfortable home atmosphere.
Every link in the decoration process is interrelated, and requires careful planning and strict quality control to create your ideal living space.