Full analysis of decoration process

Full analysis of decoration process

Renovation is a complex and systematic project. The following is my renovation process: from July 29, 2024 to handover-2024 Entering the fire on December 18th!

1. Preparation

1. Determine the style

Before decorating, you must first Determine the overall decoration style. This can be decided based on the preferences of your family members, the structural and functional needs of your home. I pursue saving money, so I chose minimalist decoration with a simple style.

2. Plan your budget

It is crucial to develop a detailed budget plan. The budget should include basic decoration costs, mainly including: water and electricity renovation, wall and floor treatment, such as ceramic tiles, floors, doors and windows, etc.

Generally speaking, basic decoration costs account for about 30% – 40% of the total budget, main material costs account for 40% – 50%, and furniture, electrical appliances and soft furnishings account for the rest. But this is only a rough ratio, and the specifics will vary depending on the decoration style and material selection.

3. Choose a decoration company or construction team or self-installation

If you choose a decoration company, you should examine its qualifications, reputation, past decoration cases and reputation . You can ask friends and family for recommendations, or you can check reviews of decoration companies online.

If you choose a construction team, make sure the workers have rich experience and good workmanship. At the same time, both the decoration company and the construction team must sign a detailed contract to clarify the rights and obligations of both parties, including the content, construction period, quality standards, payment methods, etc. of the decoration project.

Of course, self-assembly is more troublesome. You need to select materials and conduct on-site inspections every day.

4. Obtaining documents

For residential decoration, you need to apply for a decoration license and other related documents from the property management company. Provide relevant information according to the requirements of the property, such as house plans, decoration plans, etc.And pay a certain renovation deposit, construction waste removal freight, etc.

Full analysis of decoration process

My renovation deposit is 1,000 yuan.

2. Main body dismantling and modification

According to the decoration drawing design plan provided by the property management company, if the structure of the house needs to be adjusted, such as removing non-load-bearing walls, building new partitions, etc., this stage must be carried out. However, when carrying out main demolition and renovation, we must pay attention to the structural safety of the house and avoid dangerous behaviors such as demolishing load-bearing walls.

Full analysis of decoration process

3. Hydropower Engineering

1. Planning

Plumbers will work according to the design plan According to the owner’s living habits, determine the direction and location of water and electricity lines. The locations of sockets and switches that you need to install must be convenient for use, and the locations of faucets and showerheads must be ergonomic.

2. Installation

Carry out the laying of water pipes and electrical conduits. Try to use PP-R pipes for water pipes and PVC pipes for electrical wire pipes. After the water pipe is installed, a pressure test must be performed to ensure that there is no leakage in the water pipe; the wires in the electrical conduit must be color-coded to facilitate the differentiation of live wires, neutral wires, and ground wires. At the same time, strong and weakElectricity should be laid separately to avoid signal interference.

Full analysis of decoration process

4. Waterproofing Project

Waterproofing should be done in areas where water is prone to accumulate, such as bathrooms, kitchens, and balconies. First carry out base treatment on the floor and walls, and then apply waterproof coating, at least 2-3 times.

Full analysis of decoration process

After the waterproofing project is completed, a closed water test must be conducted for no less than 24 hours. Observe whether there is leakage at the corresponding location downstairs. If leakage is found , timely rework processing.

5. Mud and Tile Engineering

1. Building Walls

If there is a need for a new wall, this Proceed in stages. When building a wall, ensure the verticality and flatness of the wall, and the brick joints must be uniform.

2. Tiling

Including the laying of wall tiles and floor tiles. When laying floor tiles, pay attention to the drainage slope to avoid water accumulation; the wall tiles must be firmly adhered and the brick surface is flat. The yin and yang corners must be spliced ​​with 45-degree chamfers or treated with yin and yang corner tiles.

6. Door and window installation

The installation of doors and windows can be carried out after the masonry project is completed. When selecting doors and windows, pay attention to quality and sealing. When installing, ensure that the gaps between doors, windows and walls are well sealed to prevent air and water leakage.

Full analysis of decoration process

7. Painting project

1. Base treatment

For walls, After the top surface has been treated with the base layer, at least 2 and 1 bottom surface must be scraped with putty. Each pass must be done after the previous pass is completely dry.

After scraping for 3 seconds, use sandpaper to polish the top surface of the wall to make the surface smooth and even. Pay attention when sanding to avoid sanding marks.

2. Latex paint

Choose your favorite latex paint, which is usually contracted. You also need to apply 2 base coats and 1 top coat. Pay attention to whether the color is uniform and consistent.

The video is loading…

8. Installation Project

1. Install lamps

According to the design plan, install various lamps at appropriate locations. Chandeliers, ceiling lights, downlights, etc. During the installation process, pay attention to the fixtures being firmly fixed and the wiring connections being correct. If you know how to install it, just install it yourself. If you don’t know how, you can just hire someone to do it for a few hundred yuan.

2. Install switch socket

Install switch sockets according to the points determined by the water and electricity project, ensure that the switch control is normal, the neutral line, live wire and ground wire should not be connected incorrectly and reversely, and the sockets are well energized.

3. Install the kitchen. Bathroom appliances

Install kitchen stoves, range hoods, disinfection cabinets and other electrical appliances, as well as bathroom water heaters, bathroom heaters and other electrical appliances. During installation, follow the product instructions to ensure safe use.

9. Furniture, home appliances and software. Installation entry

1. Furniture installation

p>

Including the installation of sofas, beds, wardrobes, dining tables and other furniture. Where do you usually buy it, it comes with installation included? I bought mine from JD.com, and it also comes with door-to-door installation.

2. Place home appliances

Place TVs, refrigerators, washing machines and other household appliances in appropriate locations, and connect power supplies and related circuits.

3. Soft furnishings

Finally, the soft furnishings are arranged, hanging curtains, placing decorations, and laying carpets to create a warm and comfortable home atmosphere.

Every link in the decoration process is interrelated, and requires careful planning and strict quality control to create your ideal living space.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年1月19日
Next 2025年1月19日

相关推荐

  • 家装的这6种装修材料,已成为“经典”!未来十几年也不会过时

    文/家居杂坛 家装,就是利用不同的装修方案,把装修材料进行合理的使用。 所以,大家也会发现,装修风格的变化还是很快的。 特别是一些看似很好看的网红装修,往往很快就会被淘汰。 但是,有一些很经典的装修材料,一直还在流行。 下面要给大家介绍的6种装修材料,已经成为经典,未来十几年也不会过时。 你知道是哪几种装修材料吗? (一)——乳胶漆 乳胶漆,是非常经典的家装…

    门业资讯 2024年2月4日
    50
  • 非梵家家居2023年12月工地巡检——质量与服务铸就好口碑

      01 巡前会议   定期检查每个工地情况,工地巡检永远不是走个过场,而是真正落到实地,让施工质量更加安全规范化。 非梵家家居装饰副总裁蒋雪开工地巡检前会议   本月,非梵家副总裁蒋雪亲自带队,深入到工地,给客户展现一个真实的施工现场,查验工地工艺及其施工标准是否达标,就工艺及其细节提出合理建议,及时跟进施工现场,解决沟通现场问题,从细节中找问题,确保作品…

    门业资讯 2023年12月12日
    40
  • 装修第二套房,这四个最明智的家居决定,提高了家居生活的幸福感

    一、原木地板通铺 装修第一套房子的时候,很多“专业人士”给出的装修建议是地板通铺,从装修效果考虑,我们家选择了原木地板。 结果,尤其是在客厅和厨房以及卫生间等地方,原木地板很容易遭受一些磕碰,甚至出现一些裂痕。 现在很流行的地板通铺,恰恰增加了生活的难度,并不如大家宣传得那么好。 装修建议小tips 我们应该有区别的对待不同场所,例如,对待卫生间等地区,尽量…

    门业资讯 2024年1月16日
    80
  • 已经被央视禁止的“6种家居物件”,别再用了,真的很不安全

    今年的3.15晚会,直接给了我们“当头一棒”。看完才知道,生活中的各种套路实在太多了,让人们防不胜防。 除了晚会上面曝光的8个套路之外,央视又曝光、禁止了“6种家居物件”。真的很不安全,别再用了,快看看你家有没有? 一、电极式热水袋 冬天的时候“冻手冻脚”,很多人都喜欢揣着一个热水袋。以前的热水袋,每天都需要烧热水灌进去,麻烦又容易漏水。后来,就流行起了可以…

    门业资讯 2024年3月31日
    90
  • 这6个“装修新思路”,再过10年也不会过时,谁还没学到呢?

    我常说,很多装修方式就是“一阵风”,过了这阵子就会过时,盲目跟风去做,不仅不实用,过几年不流行了还怎么看怎么别扭。 本着授人以鱼不如授人以渔的理念,我今天就给大家分享一些百用不厌的装修新思路,按照这些装修思路来,家里的装修再过10年也不会过时! 闲话少叙,这就和大家分享一下我的这些装修新思路! 1、留出可拓展空间 装修时,记住千万不要“满”,而是要有一定的留…

    门业资讯 2024年10月17日
    30

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信