Titanium-magnesium alloy doors and windows are now the first choice for home decoration. The surface of titanium-magnesium alloy is shiny after being oxidized. The large frame is inlaid with large pieces of glass to brighten the indoor light, strengthen the contrast between the virtual and the external facades, and make the room more layered. Titanium-magnesium alloy door and window profiles have accurate cross-sectional dimensions and high processing precision. Therefore, many owners will choose titanium-magnesium alloy doors and windows when decorating. Today, Jiameilai will introduce to you the installation process of titanium-magnesium alloy doors and windows.
1. Underline positioning. The side lines of doors and windows should be measured to both sides according to the installation position, size, and elevation of the design drawings, and according to the center line of the door and window. If it is a multi-story or high-rise building, use ropes or theodolite to pull down the edges based on the top door and window edges, and draw line marks at the doors and windows on each floor to clean up some edges that are not straight. The horizontal part of the door and window should be based on the +50cm horizontal line in the floor room as the standard, and the height of the lower skin of the window should be measured upwards, and the elastic line should be straightened. The elevation of the lower skin of each layer of windows must remain the same.
2. Installation under water. Fix the water cover on the titanium-magnesium alloy doors and windows. According to the requirements of the engineering drawings, the location is appropriate and the installation is firm.
3. Anti-corrosion treatment. The anti-corrosion design of the outer surface of titanium-magnesium alloy door and window frames has regulations and should be treated according to the design requirements. If the design does not provide for it, anti-rust paint or plastic sheets can be applied to prevent cement mortar from directly contacting the surface of titanium-magnesium alloy doors and windows, causing an electrochemical reaction and causing corrosion to titanium-magnesium alloy doors and windows. When installing titanium-magnesium alloy doors and windows, if you use connecting iron parts to fix them, it is better to use stainless steel parts to connect iron parts, fixing parts and other metal parts. In addition, anti-corrosion treatment must be carried out to prevent electrochemical reactions from causing corrosion to titanium-magnesium alloy doors and windows.
4. Prepare for installation. Install titanium-magnesium alloy door and window frames according to the positioning of doors and windows, and promptly adjust the level, verticality, and slope of doors and window frames to meet quality standards, and then use wooden wedges. Temporarily fixed.
5. Fixed doors and windows. When iron parts are embedded in the wall, the titanium-magnesium alloy door and window iron feet can be welded directly to the embedded iron parts in the wall. The welding joint needs to be rust-proofed. When there are no iron parts embedded in the wall, metal expansion bolts or plastic expansion bolts can be used to fix the iron feet of titanium-magnesium alloy doors and windows to the wall. When there are no embedded parts in the wall, you can drill a hole 80mm deep and 6mm in diameter, and use L-shaped 80mm×50mm steel bars to stick to the long end and then drive the 108 cement into the hole. After final setting, the iron legs of the aluminum alloy doors and windows are welded firmly to the embedded 6mm steel bars.
6. Gap treatment. After the titanium-magnesium alloy doors and windows are installed and fixed, concealment engineering acceptance should be carried out between the door and window frames and the wall. The gaps should be processed in time according to the design requirements. If the design does not specify, you can choose elastic insulation materials or glass wool felt strips to fill them in layers. Leave a deep groove of 5 to 8 mm on the outer surface, and then fill it with suture ointment or Sealant.
7. Install door and window sashes and glass windows. Door and window sashes and door and window glass should be installed after the opening wall decoration is accepted. After the titanium-magnesium alloy sliding doors and windows are installed and the door and window frames are fixed, the glass door and window sashes should be placed as a whole. The chute in the frame adjusts the gap between the frame and the door leaf. The titanium-magnesium alloy casement doors and windows are assembled on the wall between the frame and the door leaf frame. After the installation is fixed, the glass is installed, that is, the gap between the frame and the door leaf is adjusted first, and then the glass is installed. installed in door leaf, adjust the position, and insert sealing strips and sealant.
8. Install hardware. The handle installation should be ergonomic and easy to use. During the installation process, all handles of the same wardrobe must be neat and consistent. The length of each screw should match the thickness of the cabinet door and cover. When making a hole, the size of the hole should be consistent with the diameter of the screw. Ordinary doors are equipped with two 100mm long hinges. If it is a solid door or a concave-convex door, three hinges must be used, or two hinges with a length of 125mm must be installed. After the door lock is installed, the handle distance should be between 900-1000 mm. When installing, first install the lock body and deadbolt so that the deadbolt plate is flush with the edge of the door. Close the door and determine the position of the lock plate. Then install the lock plate and ensure that the lock plate is flush with the edge of the door cover. .
The above is the installation process of titanium-magnesium alloy doors and windows briefly analyzed by Jiameilai. Hope it helps everyone!