Many decoration novices have no experience in decorating for the first time and do not know the order of decoration, which leads to confusion during the decoration process and affects the entire decoration rhythm.
Today, Iron Hammer will talk about the order of decoration. Follow the order step by step and do it. You know it well and don’t delay the decoration schedule and pace.
Remember to like + share after reading it!
01. Apply for a decoration permit
Before the official start of construction, go to the property management office of the community to apply for a decoration permit, determine the construction waste storage point, the business license and qualification certificate of the decoration company, a copy of the decoration contract, and pay a decoration deposit, etc.
02. Dismantling explanation strong>
After completing the decoration procedures, first dismantle the demolition and confirm on-site which places can be demolished and which cannot be demolished.
03. Start dismantling
DemolitionWorkers entered the site to dismantle the entire house, removing it to the cement mortar layer, and cleaned up the construction waste on site.
04. New walls
If you need to change the wiring and layout of your home, you need to build new walls. Build the wall first.
05. Water and electricity disclosure
After the whole house is dismantled, water and electricity disclosure will begin and the water and electricity points will be determined. .
06. Water and electricity layout
The plumbers came in and began to lay out the water and electricity in the whole house, fresh air, and central air conditioning We also need to start planning our approach.
After the water and electricity layout is completed, you can contact the custom cabinet merchant Door-to-door measuring tape.
07. Sealing balcony windows
Start sealing balcony windows and replace the old windows at home.
08. Replace the security door
If the old security door in your home needs to be replaced, this is the best time to replace it.
09. Waterproofing
Bathrooms and balconies began to be waterproofed
10. Wall plastering
Nowadays, the thin-laying method is used for tiling, so the flatness of the wall is required, so there is an additional process – plastering and leveling of the wall.
11. Laying ceramic tiles
After the waterproofing is completed and the wall is plastered and leveled, the ceramic tiles are laid and the check valve is installed.
12. Protective film for floor tiles
After the tiles are laid, a protective film should be laid on the floor tiles to prevent The surface of the tiles was scratched.
13. Carpentry suspended ceiling
After the tiles were laid, the carpenters began to enter the site and began to suspend the ceiling to make curtain boxes.
14. Customized door-to-door rulers for the whole house
After the tiles and ceilings are finished, contact the custom merchant to come to your door to measure the rulers. , prepare for production after confirmation, because the production cycle of customized products is longer
15. Repair cable trough
The oil workers came in to hang netting on the gaps in the wall and fill them with caulking plaster to reduce the chance of wall cracking.
16. Gypsum leveling
Use gypsum to roughly level the wall
17. Putty
Then scrape the putty 2 to 3 times, with the thickness of each layer not exceeding 2mm. After scraping, it must be completely dry before scraping off another layer, otherwise it will easily crack and fall off.
18. Apply latex paint
After the putty is dry, start applying latex paint. The latex paint should be applied once. Apply 2 coats of topcoat after primer.
19. Basic installation cleaning
The wall paint is finished, and the basic installation of the whole house is almost completed. It is over. Then start the first base installation cleaning.
20. Kitchen gas pipeline installation
21. Radiator installation
22. Make beautiful seams
After finishing the basic installation and cleaning, the house is clean and free of other debris. This period is particularly suitable for beautiful seams.
23. Kitchen and Bathroom Suspended Ceilings
Meihai completed the installation of aluminum gusset ceilings in the kitchen and bathroom.
24. Install switches, sockets and lamps
Install switches, sockets and lamps throughout the houseLight fixtures.
25. Install custom cabinets
Install custom storage cabinets throughout the house, such as cabinets, wardrobes, shoe cabinets, Bookcases, desks, etc.
26. Install wooden doors and skirting lines
After the custom cabinets are installed, start installing the wooden doors and skirting strips .
27. Install the main materials
Then install the finished main materials, bathroom, toilet, shower, shower room, etc.
28. Install kitchen appliances
Install hood stove, dishwasher, garbage disposal, kitchen sink Water dispenser etc.
29. Do land reclamation and cleaning
Do more careful land reclamation and cleaning of the whole house, and then softly decorate it Start entering.
30. Soft furnishings are entering the market one after another
Sofas, coffee tables, dining tables and chairs, beds, and mattresses are beginning to enter the market. Field.
31. Install curtains
After applying the latex paint, you can start to look at the curtains and order them. You can install it.
32. Home appliances are entering the market one after another
Home appliances such as refrigerators, TVs, sweeping robots, and washing machines are entering the market one after another.
33. Ventilation to remove formaldehyde
The renovation has been completed here, and the home should be ventilated for 3 to 6 months. After purchasing some green plants or decorations, you can move into your new home.
Have you learned it?
� �� )