This article is a conscience decoration experience written by a science and technology master owner, full of dry goods, and many details that are easy to ignore by decoration. These are very good for friends who are about to be renovated or being renovated. Let\’s take a look together!
The first step: Protection+panoramic launch
The first thing to enter the decoration company is to do it at the same time Demolition and simultaneously do it at the same time Corridor protection , brush the wall and solid on the wall after removal.
Daoli
▲ After brushing the wall and solid
▲ Didu Panorama Play is based on the renderings of the design. p>
▲ Template used to play lines
▲ The location, pattern of the wardrobe on the wall
>
▲ The position of the master bed bed
▲ ▲ Sofa in the living room The location of the coffee table
After the main material will also enter, and the construction supervision will be accepted. .com/PGC-IMAGE/42C6BD66D16F4AEABE892622355ABD63 ~ TPLV-Origi N-WEB: GIF.JPEG? _IZ = 58558 & FROM = Article.pc_detail & 953192F4 & & X-EXPIRES = 1738892102 & X-Signature = y6c9p1hajy49tu2djhmsrwk0dqu%3d \”/>
▲ The main material is completed
2. The starting ceremony
Everything is ready That is, Choosing a Liangchen Jiyi Hanging Ceremony . img src = \”https://p3-sign.toutiaoimg.com/pgc- Image/ae28C1778D5C4456851089EEF5241D48~TPLV-TT-Origin-Web: GIF.JPEG? _IZ = 58558 & FROM = Article.pc_detail & LK3S kgxnkufhd4%3d \”/>
▲ The staff of the decoration companies who start the ceremony to make the company
3. Construction bottom
After the starting ceremony, the construction base is followed up. Although it is the whole case, there are still some some projects not include in the whole case home improvement , so The most people came on this day and the most communicated content. The current status of the house is accepted (whether there is a drum, whether the backfilling layer, whether the water is normal, etc.), and the first batch of entry materials. Organize 4 nodes in the process+no less than 5 construction sites inspections
I made a big mistake here, and I made an appointment at the same time. Everyone is communicating around you, and they want to quickly explain to the people. The idea is constantly jumping, and all the decisions are directly related to the final construction, which is too tested.
Experience : The correct practice of the construction of the construction is that The foreman and hard -fled designer continue to make other people in a time period , one The matter is clearly explained, otherwise you are going to start the hyper -thread mode.
4. Hydropower transformation
users who have higher requirements for networks and electrical equipment The house\’s strong and weak electricity transformation I am very concerned. All wall insertions are planned in advance, and there is no preparation.
Let\’s talk about the power layout of each room:
▲ My family is a special Chinese and Western chefs, so the power line is more
▲ The layout of the two bathrooms is consistent
Because my high requirements for the computer , let\’s take the network line alone.
All network cables are single pipes through dual lines. On the one hand, they can be spare, and on the other hand, they do not rule out future link aggregation. >
▲ The power configuration of the computer
Some products used in strong and weak electricity renovation:
Rail sockets How many benefits were used in the kitchen and TV cabinet this time. Convenient, you can place the socket at any position in a row; the second is to use only one wall jack to lead a row of sockets. The price is actually similar to that of a row of wall plugs, and it can even be cheaper. More beautiful
Open Ring , I use it in the cabinet., Switch, neat, convenient and easy to maintain. Open frame 12U, high size 540*width 485*depth 350. Mine is still in transportation, this is the map of the merchant.
▲网上买的开放式机架
P class = \”PGC-IMG-CAPTION\”>
The part I said, the chandeliers, downlights, and shooting lights of the lighting part are drawn by the designer </strong \" In addition, the designer of the wooden work will then measure the design of a detailed version of the cabinet and bathroom according to the measurement of the .
▲ The drawings of the designer\’s subsequent output are still more serious and responsible. What isIt is not the kind of content to be implemented by the drawing, not the way out of thin air. JPEG? _iz = 58558 & from = Article.pc_Detail & LK3S = 953192F4 & X-EXPIRES = 17 38892102 & Signature =%2BYFOV%2FZQEGSLEL0VA%3d \”>
▲ ▲ refined version Sanitary drawings
5. Water renovation
There is no special
drinking water Aspect: front water purification+water purifier+pipeline machine
Bathing: There is no soft water equipment, only A.O. Smith\’s zero -cold water gas water heater. Compared to traditional water heaters, one more water pipe is laid.
A.O. Smith\’s zero -cold water gas water heater can be used as a cold water pipe as the water pipe, but the gas water heater engineer said that it is just a discount solution for the renovation of the old house. A single return pipe is settled alone . Since the new decoration is directly paved with one more backwater pipe
The pipeline is arranged by the water heater engineer, and I have not participated too much.
I installed a bathtub in one of the bathrooms (although I knew it was useless, but the children strongly requested it to satisfy her).
Find a bathtub manufacturer for engineering construction drawing, and give it to the leader.
6, 6, 6, 6, 6, Central air conditioner installation
The central air conditioner I chose is Sister Dong \’s air conditioner. I really don’t understand it, but I just watched it. I feel that Gree is indeed unique in the field of central air -conditioning. There will be no big problems.
The central air conditioner is the first time to install the equipment . The location design is basically a designer and a central air -conditioning engineer. The central air -conditioning pipeline installation and welding take about 2 days , and the test test for a period of time after installation. After the test is not a problem, wrap it up for protection.
▲ The central air-conditioning is installed
3– sign.toutiaoimg.com/pgc- Image/7ca8c37837114152B31B766FBA38C89d~ TPLV- origin-web:gif.jpeg?_iz=article.pc_detail&LKK 3S = 953192F4 & X-EXPIRES = 1738892102 & X-Signature = Nils 95%2B%2BYULH9AYZOLCAGG%3D \”/>/>
▲ Wrap it with a plastic film
▲ The effect of seeing the living room
Experience points : After installing the central air conditioner, it is found that the ceiling is expected to be 30cm thick after finishing the ceiling. And the window frame is about 25cm from the roof, which may appear that the window will be blocked by the ceiling when the window is opened .
According to the property regulations, the high -rise windows must be opened inward. On the one hand, the body is prevented from falling out of the window when opening the window.
After careful calculation, fortunately, there are some thickness in the window frame, and the central air -conditioning hanging ribs are cut off, and the ceiling has been raised a bit. Finally, the window can be opened.
The correct approach is to first install the central air conditioner or ask the position of the central air -conditioning pipeline ceiling, let the window manufacturers measure the window If the ceiling is blocked, the windows need to be added with a sub -frame to make the ceiling position. Otherwise, the windows must be re -made, and the original steel\’s tempered glass will be abolished, and the loss is not small.
7, video cable and projector hanging rack
At the same time, the HDMI cable and projection hanging rack should also be It\’s in place.
I deployed two sets of long lines: TV cabinet-projector (10 meters) , Computer Table-TV cabinet (12 meters) .
There is nothing to say about TV cabinet to projection, it must be deployed. The computer desk to the TV cabinet should be as spare. Although there are HTPC receiving power amplifiers at the TV cabinet, it does not rule out which day I want to pick up the game with the main PC.
HDMI cable joints are well tangled with electric tape, and then marked the position of the string, because the length is different, preventing the electrical workers from being wrong.
▲裹好胶布的HDMI线头
投影Machine hanging rack This time I found a product with a good quality, all aluminum alloy, the ingredients are super solid, I am very satisfied.
▲ Remark projection frame
Last /strong>
Really started, there are still many places that need attention. It is mainly in terms of multi -manufacturers\’ coordination, or it is necessary to involve a lot of energy. I hope everyone can learn some useful knowledge from my experience and let everyone complete the decoration!
(Note: This article is reproduced from the well -known technology expert@<<has been authorized by the author)