Many friends who are decorated for the first time, what should be dazed for the decoration, so that the construction period is prolonged, the cost is increased, what the cost is increased, I don’t know what to know. You can only stay in …
<p class =\" pgc-cappion \"
Let me introduce the correct decoration process and order today, so that everyone can quickly install a texture home ~
Before officially started
1st step: Clarifying living needs
Family residential population, storage, entertainment space needs, home style and future of the future Life planning (such as two babies) and so on. notB: gif.jpeg? _iz = 58558 & from = Article.pc_detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & SIGNATURE = 76xuoosxdul7E5GSGINWCHMTWBC% 3d \”/>
Step 2: Prepare the decoration budget
Prepare the budget:
Half-bag 6w
</ p>
Half-bag 7w
Half-bag 8W
half-bag 9W
Half-bag 11w
half -bag 12W
Suggestion: decoration fee, furniture fee, home appliance fee is divided by 2: 2: 1. text-align: left; \”data-track =\” 28 \”> Step 3: Determine the decoration method
mainstream decoration method There are three types, all-inclusive, half-bag, and clear bags. The differences are as follows:
Suggestion:
- <li style =\" text-align: left; All-inclusive;
- I have time but cannot track the decoration throughout the process, choose a half package;
- In full time and rich decoration experience, choose a clear package.
Step 4: Choose the decoration company
After determining the decoration method, we must also find a reliable decoration company to decorate .

Suggestion:
- Pursuing home quality can find design decoration companies;
- If you do not design or design yourself, you have time but have limited economic capabilities, choose the construction team;
<li style = \"text-align: left; Ordinary decoration company.
Step 5: Confirm the design plan and sign the contract
This is usually like this (such as Feimo Family):
Communication design → pay the house fee house → out of the graphic design drawing and overall cost → design fee design renderings → design Wolved to satisfaction → sign the construction contract, and pay the construction fee in proportion. web: gif .jpeg? _IZ = 58558 & from = Article.pc_detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = Zo7kovyk5hm66Kdujqxhrllwf4 3D 3D 3D 3D 3D \”/>
△ Graphic design diagram
△ Design renderings
p>
In the hard installation construction
The first step: Starting the bottom
On the day of the construction, the owner, designer, project manager ( The three parties were present to check and confirm the overall design and transformation. gif .jpeg? _iz = 58558 & from = Article.pc_detail & LK3S = 953192F4 & X-EXP IRS = 1739324563 & SIGNATURE = ZALMNS6R2FGYN5%2Be0jvig%3 D \”/>
Step 2: Protection before starting
Out of finished products, such as household door, window, water pipe, meter box, gas meter, etc. TT-Origin-Web: GIF.JPEG? _IZ = 58558 & From = Article.pc_detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = 5DAMPZF5BNVYH7KX2CAG7EKDBY%3D \”/>
Especially for parts For the reconstructed hardcover room, we must take perfect protection measures before construction. img src = \”https://p3-sign.toutiaoimg.com/pgc- Image/61A30FC01DC0477A86927F2594CCF~tplv- origin-jpeg?_iz=58558 &FROM = Article.pc_detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = Lqlswze7ajaehiwnbhypmk5lvyc%3d \”/>
Step 3: /p>
Demolition and newly built local walls according to the design scheme, it must be built first and then built:
① Disassembling process: Positioning → Cutting along the line → Demolition → Packing and Clearing → Sorting the site
Note:
- Loire bearing beam, column, padded surface (flat layer) forbidation.
- Public facilities (flue, main drainage pipes, gas pipelines, fire protection equipment) forbid demolition. Disassembly is prohibited from opening the door and windows, demolition involving heat insulation and waterproofing.
- The bearing wall is prohibited from dismantling. .tiaoimg.com/pgc- Image/DBFABF8CC4C4C47A0F0D6CBADE37173 ~ TPLV-Origin-WEB: GIF.JPEG? = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = AAQYMJT7FUGRDB7ZURA6KWFZ22K%3d \”/>
New process: Positioning → Basic beam → moisturizing → planting walls → cap → ceiling → ceiling → ceiling → cap → Hanging net painting → Cleaning → Maintenance
Step 4: Hydropower transformation
The whole house is up and down, and the transformation of a strong and weak circuit.
Specific process:
Hydropower base → hydropower estimation → material entry → putting wire slot → strong and weak electric fabric tube → giving water drainage tube → strong electric box finishing → on -site cleanup → project self -inspection → acceptance
Note:
① Determine whether to install the central air conditioner, fresh air system, floor heating/heating tablet;
② planning the planning of all electrical appliances, bathroom sanitary ware, hot water circulation systems in the house, the location of the socket, and the number of lamps positions , Prevent dimensional errors or omissions in the later period.
Step 5: mud tile construction
Specific procedures:
Paying pipeline construction → wall layer treatment → painting wall waterproof → paving wall tiles → painting Waterproof → closed water test → paving floor tiles → cleaning protection → marking signs
Note:
<p style = \"text-align: left; , Floor tiles, threshold stones, and confirm the paving method.
② the corners of the floor tiles and wall tiles must be protected to avoid bumps in the later construction.
Step 6 : Woodworking construction
Including ceilings, curtain boxes, cabinets, indoor doors, door sleeves, card seats, beds, wooden jewelry grassroots and other projects.
Among them, different Projects, different construction processes:
- Ceiling: Put the line → punch → install a keel → make production → production Curtain box → Make the air outlet → the keel hidden acceptance → install gypsum board
<li style = \"text-align: left; Counterplane → Sealing
- Wall wooden grassroots: Put on the line → install the grass-roots keel → make the grassroots level level → Annan Decorative panel
- Cabinet: Positioning the bomb line → punching → making cabinets → check-in → assembly fixation → installation hardware </ li>
- Door panel: prepare cutting board → select the decorative panel → press the border → the side → clean the door → install and debug
- Pot: Pole down the wooden wedge → tailoring → moisture processed → installation of the layer → installing the edge </</ li>
>
Note:
If you create a cabinet and indoor door on the spot, you need to buy various hardware accessories in advance. >
Wood production such as walls, cabinets, and the construction of late-surface latex paint. p3- sign.toutiaoimg.com/pgc- Image/7B2468F0E457FB4998A27BD6022F4~TPLV-Origin-web:gif.jpeg?_iz=5558&FROM=Article.pc_detail p lk3s = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = B%2BSYEHGYH0E536%2BYLE2TDS1GD%2BQ% 3d \”/>
Construction process:
Wall Test → Brush the interface agent → the grassroots leveling → hanging grid cloth → batch scraping putty → painting primer → painting with paint </ p>
Note:
- Before brushing paint, protect the remaining finished products that have been completed to prevent pollution.data-track = \”156\”> rainy weather is not suitable for paint work.
- The paint on the wall should be painted once and twice.
- When working on wooden paint, it is necessary to wrap the hardware to prevent pollution.
After the hard installation is completed
After the hard installation is over, various installation projects have successively entered the field:
① wall tiles and brick sewing (you can be scheduled to buy after the muddy is over)
② Switch socket and lamp installation (orbit lights, lamp bands and other embedded lamps need to be purchased and installed in the stages of woodworking; = \”https://p26-sign.toutiaoimg.com/pgc- Image/4889fceb0d7DEA272722B11030C0314~tplv- origin-eb:gif.jpeg?_iz=58558&From=arti Cle.pc_detail & lk3s = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = 35CF% 2bpcjf5z1hqmxcy7fn3i2iag%3d \”/>
③ Wooden floor+skirting line installation (select the color in the design phase, buy it at the latest after hard installation)
④ Kitchen and bathroom integrated ceiling installation (you can be preserved after the mud workers can be preserved)
⑤ Cabinet and custom cabinet installation (the water circuit diagram of the cabinet must be first tested before the water and electricity starts, and the size of the re-test is completed at the end of the mudman; the construction period is about 30-45 days) https://p3-sign.toutiaoimg.com/pgc- Image/3AB060C7D3074196971CBB47B77E1CBD~ TPLV- Origin-web:gif.jpeg?_IZ= 5858&From=article.p C_Detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & X-Signature = Gzaesr%2Baok23Y1C04E% 2bgl64n2as%3d \”/>
⑥ Form electrical and bathroom cleansing must be confirmed in hydropower stages)
<p style = \"text-align: left; The carpentry stage measurement and purchase, the construction period is about 15-30 days)
<p style = \"text-align: left; , About 7-15 days)
After the installation project is over, there are various soft furniture and accessories of sofas, beds and other soft furniture and accessories. At this point, the decoration will come to an end, and then ventilate for 3-6 months. After the indoor air quality is reached, you can check in. src = \”https://p3-sign.toutiaoimg.com/pgc- Image/d3C95B7B04b84752B90A12F081F0C4~tplv- origin-web:gif.jpeg?_iz=58558 &From=ar TICLE.PC_Detail & LK3S = 953192F4 & X-EXPIRES = 1739324563 & X-Signature =% 2FTF%2F%2bbop4V%2F4BACEZNDCMKJ%2BZZE%3d \”/>
> 189\”>> 189 \”>> 189\”>> 189 \”>> 189\”>> 189 \”>> 189\”> This is the correct order of the decoration. I wish everyone can decorate smoothly and live in a new home as soon as possible ~
(PS: Some pictures are derived from the Internet. If infringement, please contact delete.)