Super complete decoration process table, remember these 8 points of decoration without breaking the point!

When decorating, you must clarify the decoration process steps so that you can step on less lightning and save more later maintenance and modification costs. If you don’t know, you can read this super-full decoration process list , remember these 8 points of decoration without breaking the mine!

Including eight steps: the preliminary preparation stage, the early start stage, the demolition and modification stage, the hydropower construction, the bricklayer stage, the woodworking stage, the oil work stage, and the installation stage.

Baby boys, please slide back and forth and take a look. Only by grasping the decoration knowledge can you get off the car safely in the future!

01 Preparation

1. Understand the decoration, fully understand and understand the decoration price and brand;

2. Confirm The decoration style you love

3. Understand the decoration company, book a reliable decoration company, and issue a full-case design plan and budget quotation;

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. You must first look at the decoration pictures and find the style you like and love, and don’t have too many colors

2. You must first confirm the soft decoration, lighting, and furniture, but not sure. Don\’t start work, otherwise it will be a bad idea.

3. ​​Be sure to clarify your needs according to your own budget, and look at soft decorations and electrical appliances.

02 Early construction starts

House inspection, house acceptance, house measurement, design plan, renderings, construction drawings, quotation, property procedures, construction site painting, original Facilities protection, material entry, secondary line release, and construction ceremony

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Decoration method selection:

1. Half bag: Purchase the main materials yourself, and the decoration company is responsible for designing auxiliary materials and construction. You must have decoration knowledge and be able to independently purchase and identify decoration materials.

2. All inclusive: From the design, materials (main materials/auxiliary materials), and construction, the advantage is that it saves time and effort, but you must choose a reliable one. company.

3. Clearing the bag: Finding workers to work on construction, measuring the house, designing, selecting materials, purchasing, and acceptance by themselves, requires a lot of energy and time.

03Demolition and modification stage

1. Knock off the non-load-bearing wall based on the wall removal drawing (based on the site size)

2. Scoop the wall leather (The walls must be shoveled to the base layer, the walls must be shoveled to the cement mortar layer, the kitchen and bathroom must be shoveled to the original structural layer)

3. New walls (do not Build to the end at once)

4. Seal the balcony and windows (order in advance and install it before the mason.

5. Clean up construction waste

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. Go to the property in advance to apply for a decoration license;

2. Ask the property clearly whether the balcony railings can be removed and the bay windows can be removed

3. ​​Protect floor drains to prevent construction waste from being dumped into the sewer and causing blockage. /p>

4. If you want to install (water purifier, water dispenser, garbage dispenser, etc.) together, if there is floor heating, the fresh air and the construction party coordinate the order:

5. If a whole-house smart device is required, construction needs to be carried out before the demolition stage.

04 Hydropower Construction

1. Water and electricity briefing;

2. Confirmation of water and electricity budget;

3. Waterway construction [line laying, troughing, waterproofing in the groove, hot melting of water pipes, Insulation, fixing, drainage and renovation, sanitary ware pre-embedding, compression test, acceptance];

4. Circuit construction [Circuit cables, grooved pipes, threaded pipeline markings, Wire box protection, power inspection (strong power completion acceptance weakness completion acceptance)]

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. Confirmation of water and electricity positioning The owner, designer, and worker master are required to be present.

2. Make clear to designers and electricians that your electrical equipment needs are required to make an appointment with enough sockets in advance.

3. Water pipe merchants must test the pressure when accepting water and electricity. 4. After the water and electricity are completed, remember to find a master to ask for it. A statistical table of the quantity and size requirements of the switch, socket spotlight downlights, which is convenient for online shopping related materials in the later stage.

05Wammer Stage

1. Ground leveling;

2. Bathroom backfilling;

3. Waterproofing treatment (bathroom, balcony, kitchen):

4. Water-closed experiment (the time of water-closed experiment is 48 hours):

5. Sewer;

6. Acceptance of kitchen and bathroom waterproofing and concealed projects;

7 , wall tiles laying;

8. Floor tiles laying;

9. Install floor drains, door stones, and windowsill stones .

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. There are many tilesBuy, but you can’t buy less. If you have too many, you can refund the few and buy them. If you buy them, you may have different colors due to different batches.

2. Check if there is any problem with the tiles before laying the tiles, right? 3. Waterproofing should be done with the downstairs The neighbor said hello and went downstairs to see if there was a leak in the later stage.

4. Prepare a flue check valve when laying tiles in kitchen and bathroom.

5. Communicate in advance the way of laying tiles and confirm where to start laying tiles in the living room and bedroom.

06 Woodworking stage

1. ceiling elastic line (release the ceiling elevation line according to the requirements of the construction drawing;

2. Fixed hanging rod (elastic line The holes are opened at the location, the holes are 08m-1m, the depth is 5cm, and the spacing between the booms is less than 1m):

3. Stick soft connection;

4. Install the edge keel;

5. Install the keel (the spacing between the main keel is less than 800cm, and the spacing between the secondary keel is less than 400cm);

6. Cover the plate;

7. Point anti-rust paint and treat the joints;

8. The position of the pre-embedded opening of the lamp;

9. The completion acceptance of the woodworking roof and facade;

10. Measure door size:

11. Measure cabinets, indoor doors, and customized product measurements.

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. Must You must first look at the decoration pictures and find the style you like and love, and don’t have too many colors

2. You must first make the soft decoration, lighting, and furniture sure that it is not sure, and don’t start work. , otherwise it will inevitably fail and look bad.

3. ​​You must clarify your needs according to your budget, and look at soft decorations and electrical appliances more.

07 Oiling stage

1. Wall paint interface agent (need to apply twice)

2. Grass leveling

3. Grinding putty layer to repair

4. Brush latex paint

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Precautions:

1. Interface agent needs to be applied twice

2. It is divided into gypsum layer and putty layer. It is necessary to apply gypsum 1 time, hang 1 layer of mesh cloth, 3 times of putty, and scrape it again when it is dry

3. Grind and find lighting for replenishment lamps. Where there are dark shadows are uneven places, and you need to find replenishment. If the reflection is even, it will be flat.

4. In principle, it is \”one base and two sides\”, that is, 1 primer and 2 topcoats. Do not open the window immediately after the latex paint is brushed, otherwise it will crack. It should dry naturally for 2-3 days before appropriate Open the window for ventilation.

5. Leave a small jar to facilitate future repainting.

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

08 Installation stage

1. Switch and socket installation;

2. Cabinet installation and acceptance;

3. Wooden products installation and acceptance (wooden doors, Bathroom cabinets, customized cabinets, etc.)

4. Wood floor installation and acceptance;

5. Sanitary ware installation and acceptance;

6. Installation and acceptance of lamps;

7. Reclamation and cleaning:

8. Installation and acceptance of curtains and accessories:;

9. Entering and acceptance of furniture and electrical appliances:

10. The overall completion acceptance of the project:

11. Enter the warranty period and move in.

Super complete decoration process table, remember these 8 points of decoration without breaking the point!

Through the above complete decoration process list and precautions, I believe you have a deeper understanding of decoration. Remember these 8 points to make your decoration road smoother, worry-free and labor-saving!

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年2月8日
Next 2025年2月8日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信