Decoration is a major life event that every family has to experience, but 90% of owners will leave regrets for the first time of decoration. As a experienced person who has experienced the renovation of three houses, today I will share a replicable decoration strategy to help you avoid pits worth 100,000 yuan.
1. Preparation: Decoration does not start with measuring the house
1. Golden Rules for House Type Optimization
Don\’t be superstitious about Internet celebrities Design, plan the space according to the structure of family members. It is recommended for families with two children to build a growth living room, and leave barrier-free access to retired parents\’ rooms. Tested data: Reasonable dynamic line design can improve space utilization by 30%.
2. Decoration method selection formula
Clear bag=time cost × 3+experience value × 5
Semi-package=Average market price × 1.2+Supervising energy × 2
All inclusion=Basic quotation × 1.5+Increase budget × 30 %
It is recommended that office workers choose the half-pack + third-party supervision model, saving 30,000-50,000 yuan over the full coverage
2. Budget planning: This way the allocation will not be overspent
It is recommended to use Rule 532:
50% hard installation (water and electricity + wall + floor)
30% main material (tiles/ Floor/bathroom)
20% emergency reserve (must be kept!)
Warning: The actual expenditure on water and electricity transformation is usually a quote 1.5 times
3. Guide to prevent pits from choosing decoration companies
1. Look at the construction site three Elements:
Whether the water and electricity traces are horizontal and vertical
Whether the waterproof test is done for 48 hours
Whether to use L-shaped whole board in the ceiling corner
2. Required terms for signing a contract:
Increases shall not exceed 5% of the total price
The materials must be accepted by three parties
The final payment shall be kept at least 10% before being paid after check-in for 3 months
4. Core skills for purchasing main materials
1. Ceramic tiles: Choose high-quality products from Guangdong, save 30% on direct purchase of goods in the warehouse
2. Floor: Reinforced composite selection 1.2c
m thick, solid wood composite must check cross-section
3. Bathroom: Hardware must have 304 steel stamps, toilet must Test the glaze flatness
5. Acceptance list for key construction nodes
1. Hydropower stage: take photos and retain circuit diagrams, and the circuit of the strong power box must be independent
2. Brickworking stage: use coins to knock on the hollow rate to check the hollow rate <5%
3. Oil worker stage: use a flashlight to sideways to check the flatness of the wall at night
6. 5 tests must be done before moving in
1. Formaldehyde detection: After closing doors and windows for 12 hours, the data is <0.08mg/m³
2. Insert test: Open 3 faucets at the same time to see the drainage speed
3. Circuit load: All high-power appliances run at the same time for 15 minutes
The more expensive the decoration, the better. The key is to know how to control the key nodes. It is recommended to bookmark this article and check each construction stage. Remember: all verbal promises must be written into the contract, and the progress must be paid after passing the acceptance. . The decoration company is most afraid of meeting such an owner: you who understands the process and can accept it.