After the New Year, many families have started to prepare for decoration. Many owners have their first decoration and don’t know what the overall decoration process is. So today, the editor will sort it out for you and List the items that may be missed and you can collect them in advance.
1. Design (recommended to reserve more time)
Many owners are unreasonable in decorating the space, and at least once they are decorating it It costs 70,000 to 80,000, so we should be more cautious and reserve more time in space planning.
1)As many rooms as possible: For example, do you need to plan the room of a future child or the elderly? Where do you usually have friends here to live? So when planning a room, don’t just think about how many rooms we need at the moment.
2)What kind of air conditioner should be selected?: This must be determined before decoration, if you want to install the center For air conditioners, you need to make a suspended ceiling and look at the air conditioner model in advance.
3)Does the balcony be sealed? Do the developer\’s own windows need to be replaced?: Especially for families near the street, the noise outside may be relatively high. If you want to change the windows , may involve demolition and modification around the window, so if you want to change it, please change it while you are renovating it.
4)Heating Pipe Reservation: Even if you may not need it at the moment, it is recommended to reserve pipes, just like my family did not plan heating pipes because of the small apartment, but later the community It would be very ugly to install pipes if you need centralized heating.
2. Filtering of decoration companies
First of all, it depends on your budget. Nowadays, many people are thinking about saving money, so It is recommended to find the foreman directly. Even if it is all for the foreman, the cost may not be too high. You can ask in the community group.
Warning: Don\’t relax your vigilance just because the foreman wants to invite you to dinner. It should be done when signing the contract What is it or what, you must reserve enough time for screening decoration companies and not be too hasty.
III. There is not much to say about demolition and modification
Just plan the space well.
IV. Hydropower
1) Hydropower Planning: In this article, I will specifically emphasize planning, because many owners will step on the trick: the planning is unreasonable or forget the location.
Washing machines, wall-mounted washing machines, sweeping robots, fish tanks, these require planning waterways and circuit points. Even if you don\’t have any needs now, you will definitely You have to plan in. In additionProjection Circuits such as instruments, wall-mounted fresh fans, smart toilets, small kitchen treasures, etc. also need to be planned in advance.
2) Water: Waterproofing requires water closure experiments, and water pipes must be tested with pressure; be sure to test it. : #F04142; –tt-darkmode-color: #F04142;\”>Is hot and cold water sprinkled with water? If there is heating, hide the heating pipes.
3) Electricity: Planning of smart switch sockets, like my home, there are not many switches, most of them are It is a smart switch. According to the needs, I chose two smart sockets, mainly for non-smart home appliances. Weak current generally has network cables and Audio cable.
It should be noted: Smart switch must reserve neutral wire, try not to select single fire smart switch.
5. Brickworker
Select tiles in advance, but you need to pay attention to it. There is Many owners have overturned the tiles on the color. Be sure to take natural light to look at them, don\’t look at them in the store.
If your circuit is topped, then you have to finish the tiler first, and then do the circuit transformation.
6. Woodworking
mainly suspended ceilings, partitions, etc.
Be sure to determine the location of your lamps and curtains before making a suspended ceiling.
Curvesting needs to be laid woodworking boards, otherwise it is easy to break the gypsum boards; the weight of the lamps must be well paid, if it is too heavy, it needs to be laid woodworking boards in advance to increase the load bearing.
7. Kitchen and Bathroom
Tileworker Make bathroom tiles well, you can actually make aluminum buckle ceilings.
The kitchen needs to determine the model and size of the range hood in advance. It is recommended to install the range hood first and then make a cabinet. Customization.
8. Paint, wooden doors, wooden floors
First, scrape the putty first, and then In fact, you can make wooden doors and wooden floors. Some families also paint the latex paint first, and then make wooden doors and wooden floors.
9. Customized cabinet
The walls of custom cabinets do not need to be scraped with putty. If you scrape the putty, you must make sure that the putty has dried before making a custom cabinet, otherwise the back panel will be easy Moisture.
10. Installation of lamps and air conditioners
As long as the wall is painted with latex paint, air conditioners can be installed, and so are lamps.
can be carried out simultaneously with custom cabinets.
11. Furniture enters, repairs and cleaning
After the furniture enters, Need to do some partial repair. For example, if the wall cracks or the walls are bumped when the cabinets or furniture are installed, they all need to be repaired and then cleaned.
Above I have also summarized the basic decoration process and some precautions, hoping that it can help everyone.