Detailed steps and precautions for the 2025 decoration process! One article

Decoration is similar to learning bicycles. You can read the decoration strategy thousands of times online, but you will inevitably fall if you get it yourself. Therefore, the purpose of our strategy is not to understand how to operate each link, but to understand common sense and establish knowledge index, and to prevent and remedy in advance where it is easy to fall into pitfalls.

Detailed steps and precautions for the 2025 decoration process! One article

Today, I will explain the entire process of decoration and precautions for you. After reading it, novices will not fully understand the way of decoration companies. At least they know where there are easy things to be tricky in the decoration and how to avoid pitfalls. They will also have more direction and confidence when communicating with decoration companies!

1. Preparation

● Decoration steps

①Confirm the half-packing and repair (1-2 days)

②Confirm the design plan (3 days)

③Change the total budget (4 days)

④Confirm the electrical appliance model/size (10-15 days)

⑤Renovation procedures (2 days)

Detailed steps and precautions for the 2025 decoration process! One article

● Notes

① Confirm the materials before the construction drawings, otherwise the selection of materials after construction will affect the construction process and quotation.

② Before starting construction, print a decoration notice at the door of the unit and inform the neighbors that they want to decorate.

③ If you have half a package, just look for a local small decoration company; if you have all packages, you have to find a large decoration company to examine their main material supply capabilities.

④ If you add one to the contract, the final decoration cost will not exceed 5% of the budget, and the excess will be borne by some decoration companies.

● The main materials that the owner needs to purchase

Whole house water purification, temporary toilets, sewer covers, central air conditioning, floor heating, fresh air, anti-theft doors, anti-theft windows

The most important thing in the preliminary preparation process is to find a reliable decoration company. Brother Wen said the \”secret\” of an industry: some decoration companies do not support their own workers, and after signing the contract, they will decorate the cooperative construction team. In other words, no matter whether you are looking for a decoration company or a construction team, it is possible that the same group of people are working.

Is it possible to directly contact the construction team? No, the difference is quite big. The decoration company will have construction standards to restrict workers. Even if the same group of people work, the decoration company can ensure that your construction quality is better than that of the construction team and the process is more standardized.

Although the construction team is about 15%-20% cheaper than the decoration company\’s quotation, don\’t think about after-sales service or something. Although decoration companies are expensive,There are a series of quality assurances and after-sales guarantees. For example, hidden projects such as water and electricity generally have a 5-year warranty and a 2-year warranty for surface projects.

Detailed steps and precautions for the 2025 decoration process! One article

2. Demolition and modification stage

● Decoration steps

① Dismantling and restructuring briefing (half-day)

② Knocking the wall and shoveling the wall (2-5 days)

③ Demolition and new construction (2-5 days)

④ Garbage removal (half-day)

④ Garbage removal (half-day)

⑤Initial measurement of cabinet size (1 day)

● Notes

①In this stage, the focus should be on good protection of floor drains to prevent construction waste from falling into the sewer and causing blockage.

②The connection between new and old walls should be carried out to prevent hollowing and cracking in the later stage

③Confirm that the wall is removed to the cement mortar layer or the red brick layer to avoid additional items

④ Garbage removal is a common missed item. Check with the decoration company in advance whether it is included. If it is not included, it will save money by handling it yourself.

● Main materials that need to be purchased by the owner

Sanitary ware, embedded refrigerator, range hood, gas stove, wall sanitary ware, and bath partition

IV. Brickworking stage

● Decoration steps

① Brickworking briefing (half-day)

② Turbo water treatment (2-3 days)

③ Water closing experiment (2 days)

④ Install wall tiles, floor drains, and door stones (5-6 days)

⑤ Brickwork acceptance (1 day)

● ​​Notes

① Before doing waterproofing, you must say hello to the neighbors downstairs. It is best to go downstairs to see if there is a leak.

②When laying tiles on kitchen and bathrooms, prepare a flue check valve.

③ Find good wall and floor tiles and beautiful jointsThe manufacturer of agent and windowsill stone starts to make reservations.

⑤ Whether to install door stones will affect the early leveling work. The method of replacing door stones with extremely narrow strips requires no level height difference on the ground.

● Main materials that the owner needs to purchase

Interior doors, wooden floors, protective films, latex paint (select to purchase)

V. Woodworking/painting stage

● Renovation steps

① Ceiling construction (2-3 days)

② Install curtain boxes (1 day)

③ Make cabinets on site (2 days)

④ Woodworking acceptance (3-4 days)

⑤ Scrape putty (2-3 days)

⑤ Scrape putty (2-3 days)

④ Carpentry acceptance (3-4 days)

⑤ Scrape putty (2-3 days)

⑥ Brush latex paint (1-2 days)

● Notes

① After the materials are entered, check whether the model and manufacturer are consistent with the contract to prevent inferior products from being used as good products.

② When making the ceiling corner, you must cut the entire board into a 7-shaped shape.You can splice two boards, otherwise it will easily crack if you apply latex paint.

③ The spacing between the main keel is <1000mm, the spacing between the secondary keel is <400mm, the spacing between the hanging points is <1000mm, and the ceiling width exceeds 700mm.

The oil worker process is also recommended to go to the acceptance in person. Some workers are perfunctory if you don’t focus on working, and cutting corners is common.

VI. Installation stage</spanning room hardware</spanning room, custom cabinets, etc.

After all this, the decoration is basically over. All the family members who have seen this, please give me some tips to give me some advice. Thank you~

Lastly, let me talk about it, it is also important to plan the selection and entry time of materials. Not only do you need to understand the name and function of the materials, but also know the timing of their purchase. Buying too early will take up space, and buying too late will affect the construction progress and delay the entire decoration plan.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年3月1日
Next 2025年3月1日

相关推荐

  • 10例——“智能家居”产品设计!

    全屋智能的时代已悄然到来 为用户带来更为便捷与人性化的体验 今天分享10例“智能家居”产品设计 希望带给大家更多设计灵感~ 01、Blooming out 设计:Sunjin Na “Blooming out”通过融合智能家居趋势和满足个人生活方式的功能设计,重新构想传统路由器。 解决常见问题:如看不见的电缆和过时的天线,这种创新的路由器特点是风扇般的折叠结…

    门业资讯 2024年10月1日
    70
  • 又有品牌打假维权,家居企业如何向制假售假说“不”?

    为抵制家居制假售假行为,维护消费者合法权益,近段时间,包括顾家家居、梦百合等企业发布打假声明。 顾家家居公布了84家未授权网店,同时称“未经顾家家居官方认证和授权的门店所销售的非官方产品,顾家家居不承担任何售后服务责任”;梦百合发布维权打假声明称,第三方平台出现多家假冒、伪劣、未经“梦百合”品牌授权擅自售卖同款假冒伪劣产品的店铺。 业内人士表示,目前家居品牌…

    门业资讯 2024年6月20日
    70
  • 回家后衣服别乱放了,学学这户人家的做法,干净整洁还有条理

    每次从外面回到家里,你是不是也是把衣服随便往那一扔? 其实,我也是这样。每次回到家,把衣服脱了,直接往床上一扔,就不管了。 但是,如果是夏季,衣服比较单薄,可能还好办。如果是冬季,羽绒服、大衣,那么怎么办呢? 如果这些衣服,我们不能有效的收纳整理,你会发现家里越住越乱,甚至都有灰尘。 奉劝大家,要学会合理的收纳,而不是把衣服乱放。 本期分享:回家后衣服的放置…

    门业资讯 2024年9月6日
    140
  • 打破家居“沉闷感”的21种方法

    年轻人装修最爱现代极简风,尤其以黑白灰色系为主,追求一个简单耐看,永不过时,但是过于简单也会带来一个问题,家里没有一点生活温度,色系沉闷且单调。 本期,我们想人所想,急人所急,分享21个成本极低,甚至不要钱的解决方案,每一个都能打破沉闷感,营造温馨、放松的家居氛围~ 赶紧把购物车里昂贵的装饰摆件一键删除吧~ 1、插花 就地取材系列——狗尾巴草插花。 路边随手…

    门业资讯 2024年10月21日
    30
  • 是哪个大聪明想出来的?这6个家居“平替”,也太牛了!

    很多人不知道的家居“平替”,不要亏在信息差了,大家一定要码住哦! 独具匠心的平替方案,实用又惊艳! 看完你就知道,这些平替能省下很多钱。 以下是精心挑选的6个家居“平替”方案,让你不出几十块钱,也能拥有与高价产品媲美的实用好物。 01、珐琅板平替-镀锌板 火遍全网的磁吸珐琅板,材料费不少于300每平方,还要安装费啥的,就厨房灶台的位置加起来估计得要1-2千。…

    门业资讯 2024年5月11日
    130

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信