Disassembly of the entire process of interior decoration: From unfinished to moving in, avoiding these 20 pits to save worry and money

Disassembly of the entire process of interior decoration: From unfinished to moving in, avoiding these 20 pits to save worry and money

Decoration is a protracted battle against time, budget and details. According to the decoration industry data in 2025, 83% of owners have delayed construction periods or overdue budgets due to process chaos. This article combines 20 years of experience as a foreman to sort out the most comprehensive guide to avoid pits on the entire network to help you accurately control each link.

1. Detailed explanation of the 6 major stages of the decoration process

Stage 1: Preliminary planning (7-15 days)

Demand list sorting: record the family\’s population structure, living habits (such as pet dynamics, fitness equipment storage needs), and sort by priority.

Decoration mode selection:

Full decoration: suitable for white-collar workers who are busy with work, with an average price of 1,800-3,000 yuan/㎡ (including soft decoration)

Second package: The main materials are more flexible to purchase, and the work needs to be supervised for 2 hours a day

Facilities measurement trap avoidance: designers are required to provide electronic drawings with dimension marks, focusing on checking the location of doors, windows and pipes.

Stage 2: Demolition and reconstruction (3-7 days)

5 must be accepted:

Load-bearing wall protection (use metal detector to confirm the position of the steel bars)

Floor drain sealing test (pour 10L of water into observation of drainage speed)

New wall implanted steel bars (add 2 6mm steel bars per 60cm height)

Door hole beam reinforcement (length of prefabricated cement beam > door width 20cm)

Debris cleaning route planning (avoid scratching elevators and corridors)

Stage 3: Hydropower transformation (7-10 days)

Golden rule of positioning:

Kitchen: reserve at least 8 sockets (including washing dishes).Machine and water purifier point)

Bathroom: 1.8m height reserved for mirror front light, smart toilet socket with splashproof box

Material selection points: choose BV single core hard wire (life 10 years longer than BVR wire), PPR antibacterial tube for water pipes.

Stage 4: Three brothers of wood shingle oil (15-30 days)

Job type Core process Acceptance standard

Woodworking Light steel keel ceiling V-trough treatment at joints Anti-cracking

Brickworker Wall tiles thin method hollowing rate ≤5%, cross snap alignment error <1mm

Oiler Find straight corners of Yin and Yang 2 meters by ruler detection flatness error ≤3mm

Stage 5: Installation battle (5-7 days)

Sequence formula: First suspend the ceiling, then cabinets, first door covers, then floors, first hard decoration, and then furniture.

Must-read for details:

Leave 2cm expansion joints between cabinets and ceilings

Apply neutral anti-mold glue at the junction of floors and skirting lines

Stage 6: Soft decoration end (3-5 days)

Formaldehyde treatment plan:

High temperature fumigation method (heating to 35°C for 48 hours in closed space)

Photocatalyst spraying (focus on density board furniture)

Activated carbon exposure and renewal every month (combined with industrial fans to form air convection)

2. 10 details that 99% of owners regret

Contract trap: Beware of the \”real settlement\” clause, requiring that the additions shall not exceed 5% of the total budget

Beautiful seams: choose light-colored tiles in the same color epoxy color sand, and use pearl black seams to make dark bricks

Light design: choose color temperature 300 0K (bedroom) – 4000K (kitchen), color rendering index > 90

Storage system: Custom cabinet depth is designed to be 55-60cm, reserved track socket power supply

Smart embedding: ceiling embedded smart audio lines, curtain boxes retain 25cm wide compatible electric tracks

3. 2025 hot decoration trends

Material innovation: micro-cement walls (virtual resistance level reaches 9H), graphene floor heating (energy consumption is reduced by 40%)

Space magic: migration line design (small apartments are 30% larger), sunken entrance (isolated outdoor dust)

Aging-friendly details: Folding seats in the shower room, zero-height difference treatment on the whole house floor

If it is helpful to you, please save the flowchart of this article.

#Interior Design#​#Whole house customization avoids pit#​#Decoration things#​#Decoration#​

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年3月1日
Next 2025年3月1日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信